5.MAINTENANCE

It is recommended that the following inspections be carried out on the boiler at least once a year:

1 - Check the seals for the water connections; replacement of any faulty seals.

2 - Check the gas seals; replacement of any faulty gas seals.

3 - Visual check of the entire unit.

4 - Visual check of the combustion process or analysis of combustion by- products (see section 3.6) and cleaning of the burner if needed.

5 - If called for by point. 3, dismantling and cleaning of the combustion chamber.

6 - If called for by point. 4, dismantling and cleaning of the burner jets.

7 - Visual check of the primary heat exchanger:

-check for overheating in the blade assembly;

-clean the exhaust fan if needed.

8 - Adjustment of the flow rate of the gas: flow rate for lighting, partial load and full load.

9 - Check of the heating safety systems:

-safety device for maximum temperature;

-safety device for maximum pressure.

10- Check of the gas safety systems:

-safety device for lack of gas or flame ionisation (detection electrode);

-safety device for gas cock.

11- Check of the electrical connection (make sure it complies with the instructions in the manual).

12- Check of domestic hot water production efficiency (flow rate and temperature)

13- General check of the combustion by-products of the discharge/ventilation system.

14- Check of the general performance of the unit.

21

Image 21
Contents Installation Instructions Type C Boilers Table of Contents General Information Overall View Installation Overall Dimensions Supply must be fused at 3 a Domestic Water Morley Road TonbridgeKent TN9 1RA 80 mm Systems Restrictor Extension Piping not insulated Piping insulatedRestrictor No Restrictor Extension Piping not insulated Piping insulatedCalculating the lengths of the pipes, Electrical Diagram Central Heating Return Commissioning Control Panel Initial START-UP Operational Adjustments Status ANTI-FROST Device Methane Liquid Gas Butane GAS AdjustmentsG20 Gas G30 16.0Maintenance Boiler MiscellaneousProgrammer Technical Service Hot Line 01494 Technical InformationManufacturer Merloni TermoSanitari SpA Italy Servicing Instructions Type C Boilers Fault Finding Removing the front panel Servicing InstructionsRemoving the side panels Removing the sealed chamber frontal coverRemoving the combustion cover Removing the burner and jetsRemoving the electrodes Removing the main heat exchanger Removing the fan Removing the air pressure switchSetting the minimum and the maximum power of the boiler Setting the gas pressuresSetting the maximum heating circuit power Setting pressure for soft ignitionRegulating the heating power for Natural gas G20 Regulating the heating power for Butane gas G30Regulating the heating power for Propane gas G31 Removing the spark generator Removing the D.H.W. secondary exchanger Removing the gas valveRemoving the safety valve Removing the main circuit flow switchRemoving the automatic air vent Removing the pump Removing the expansion vessel Removing the pressure gaugeRemoving the heating temperature sensor N.T.C Removing the D.H.W. temperature sensor N.T.CRemoving the D.H.W. flow switch Removing the overheat thermostatRemoving the time clock Checking the fusesRemoving the P.C.B Finding diagrams described in this chapter Fault FindingYES YES ∆ P 1.2 mbar YES Electrical Diagrams MicroGENUS 23/27 Mffi MicroGENUS 23/27 Mffi Ariston Page Manufacturer Merloni TermoSanitari SpA Italy Microgenus 27 Mffi Cod Part Code Description 998924 Panel combustion chamber front 571770 Main flow switch top cap