1. Top Vent - Horizontal Termination - (continued)
Three Elbows
Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).
V1 Minimum** | H1 Maximum | H1 + H2 Maximum | |||
90 Elbow Only** | 457 mm | 2 ft. | 610 mm | ||
1/2 ft.** | 152 mm | 457 mm | 4 ft. | 1.2 m | |
|
|
|
|
|
|
457 mm | 3 ft. | 914 mm | 6 ft. | 1.8 m | |
|
|
|
|
|
|
762 mm | 5 ft. | 1.5 m | 10 ft. | 3.0 m | |
1.1 m | 7 ft. | 2.1 m | 14 ft. | 4.3 m | |
1.4 m | 14 ft. | 4.3 m | 14 ft. | 4.3 m | |
|
|
|
|
|
|
H1 + H2 MAX. =14 ft. (4.3 m)
V1 + V2 + H1 + H2 MAX. = 40 ft. (12.2 m)
** See Warning Below.
H2
Note: Use SLP Series components only.
V2
H1
V1
WARNING**
Fire Risk.
•When using
required before installing first elbow.
Figure 7.6
26 | Hearth & Home Technologies • DV3732SBI, DV3732SBIL • |