Hearth and Home Technologies DV3732SBIL manual Appliance Preparation, Top Vent

Page 39

9 Appliance Preparation

A. Top Vent

CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

NOTICE: Once appliance is set up for top or rear venting, it CANNOT be changed at a later time.

Note: Actual unit may look different than the fireplace shown in this section.

2 SCREWS

Figure 9.4 Remove the seal cap.

Figure 9.1 For top vent, remove the two screws holding the top heat shield in place. For rear vent, see Section 9.B.

WARNING! Risk of Fire! Do not remove heat shield. El- evated header temperatures may cause a fire.

Figure 9.2 Rotate the top heat shield to the vertical position as shown above. The heat shield must remain in the vertical position.

Figure 9.5 Remove the insulation basket and white insula- tion from the center vent pipe.

2 SCREWS

Figure 9.3 Replace the two screws as shown.

Figure 9.6 Remove the insulation from the outer vent pipe.

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

39

Image 39
Contents Models What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Unlimited Mantel and Wall ProjectionsMinimum Minimum FT. MaximumVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Fire Risk Vent Diagrams Top Vent Horizontal Termination One ElbowTop Vent Horizontal Termination Two Elbows Installed HorizontallyV1 Minimum H1 Maximum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 mMinimum Maximum Top Vent Vertical Termination Two Elbows Three ElbowsV1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Four 90º ElbowsPage MAX MIN + H 2 MAX Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow MIN MAX + H 2 MAX Rear Vent Vertical Termination Three elbowsTermination Cap Flue Damper Prior to installing the gas applianceCoaxial to Colinear Venting Clearances to CombustiblesConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning, Leveling And Securing Securing and Leveling the ApplianceAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Wall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelTOP View Facing Material 16 Noncombustible Facing DiagramTemplate DoorsElevated Hearth Systems Appliance Setup Slot a Install the Log AssemblyMate slot C with tab C Mate slot with locating screw Air Shutter Settings Install Louvers and TrimInstall Hood Air Shutter SettingTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-CCS-BK SLP-DCF-BK SLP-FLEX-TRAP SLP-TVHWSLK-SNKD DVP-FBHT LINK-DV30B DVP-2SL DV-46DVA-GCL Optional Wire HarnessPVI-SLP SLP-LPCService Parts List At DepotGas Fireplace DV Service Parts #12 Valve AssemblyContact Information