Hearth and Home Technologies DV3732SBI manual DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP

Page 70

B. Vent Components Diagrams (continued)

8-1/8 in.

(206 mm)

15in.

(381 mm)

13in.

(330 mm)

Effective Length 5-3/4 to 8-3/8 in. 146 to 213 mm

5-1/2 in.

8-3/8 in.

140 mm

213 mm

87°

10-1/2 in.

267 mm

10-7/8 in.

276 mm

DVP-HRC-SS

DVP-HRC-ZC-SS

HORIZONTAL TERMINATION CAP

Figure 16.6 DVP vent components

WARNING

Fire Risk.

When using SLP-HRC-SS and SLP-HRC-ZC- SS termination caps on top vented fireplaces, a one foot minimum vertical vent section is

required before installing first elbow.

• When using DVP-TB1 termination cap on top vented fireplaces, a three foot minimum vertical vent section is required before installing first elbow.

15in.

(381 mm)

8-1/8 in.

(206 mm)

13in.

(330 mm)

Effective Length 5-3/4 to 8-3/8 in. 146 to 213 mm

5-1/2 in.

8-3/8 in.

140 mm

213 mm

87°

10-1/2 in.

267 mm

10-7/8 in.

276 mm

SLP-HRC-SS

SLP-HRC-ZC-SS

HORIZONTAL TERMINATION CAP

DVP-TB1

SLP90 SL-2DVP

DVP-TB1

 

 

 

 

ASSEMBLY

 

 

 

 

 

 

 

 

 

 

DVP-TB1

 

 

Figure 16.7 SLP Series Vent Components

HORIZONTAL TERMINATION CAP

 

 

 

 

 

70

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

Image 70
Contents What to do if you smell gas ModelsHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Logs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMinimum FT. Maximum Mantel and Wall ProjectionsMinimum Minimum UnlimitedTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One Elbow Fire RiskInstalled Horizontally Top Vent Horizontal Termination Two ElbowsTop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two Elbows Three Elbows Minimum MaximumTop Vent Vertical Termination Four 90º Elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINPage Rear Vent Horizontal Termination Two Elbows MAX MIN + H 2 MAXRear Vent Vertical Termination One Elbow Rear Vent Vertical Termination Three elbows MIN MAX + H 2 MAXClearances to Combustibles Prior to installing the gas applianceCoaxial to Colinear Venting Termination Cap Flue DamperConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Connecting the DV-46DVA-GCL Adapter to Appliance Top VentRear Vent Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning, Leveling And SecuringAssemble Vent Sections DVP Pipe Only Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardTOP View 16 Noncombustible Facing Diagram Facing MaterialDoors TemplateElevated Hearth Systems Appliance Setup Install the Log Assembly Slot aMate slot C with tab C Mate slot with locating screw Air Shutter Setting Install Louvers and TrimInstall Hood Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP DVP vent componentsDVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDVP-TV SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-FLEX-TRAP SLP-TVHW SLP-CCS-BK SLP-DCF-BKSLK-SNKD DVP-FBHT SLP-LPC Optional Wire HarnessPVI-SLP LINK-DV30B DVP-2SL DV-46DVA-GCLAt Depot Service Parts ListGas Fireplace DV #12 Valve Assembly Service PartsContact Information