Hearth and Home Technologies DV3732SBIL manual Finishing, Appliance Setup, Troubleshooting

Page 4

13 Finishing

A. Splatter Guard . . . . . . . . . . . . . . . . . 53

B. Mantel and Wall Projections. . . . . . . . . . . . 55

C. Facing Material. . . . . . . . . . . . . . . . . 56

D. Doors. . . . . . . . . . . . . . . . . . . . . 57

E. Elevated Hearth Systems. . . . . . . . . . . . . 58

14 Appliance Setup

A. Remove Fixed Glass Assembly. . . . . . . . . . . 59

B. Remove the Shipping Materials. . . . . . . . . . . 59

C. Clean the Appliance. . . . . . . . . . . . . . . 59

D. Accessories . . . . . . . . . . . . . . . . . . 59

E. Lava Rock, Rockwool/Ember Placement. . . . . . . 59

F.Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . 60

G.Fixed Glass Assembly . . . . . . . . . . . . . . 62

H.

Install Louvers and Trim

. 62

I.

Install Hood

62

J. Air Shutter Setting . . . . . . . . . . . . . . . . 62

15 Troubleshooting

A. Intellifire Ignition System . . . . . . . . . . . . . 63

16 Reference Materials

A. Appliance Dimension Diagram. . . . . . . . . . . 65

B. Vent Components Diagrams . . . . . . . . . . . . 66

C. Service Parts List . . . . . . . . . . . . . . . . 75 D. Contact Information . . . . . . . . . . . . . . . 77

= Contains updated information.

4

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

Image 4
Contents What to do if you smell gas ModelsHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Decorative Doors and FrontsLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections MinimumMinimum FT. Maximum Minimum UnlimitedTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One Elbow Fire RiskInstalled Horizontally Top Vent Horizontal Termination Two ElbowsTop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two Elbows Three Elbows Minimum MaximumTop Vent Vertical Termination Four 90º Elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINPage Rear Vent Horizontal Termination Two Elbows MAX MIN + H 2 MAXRear Vent Vertical Termination One Elbow Rear Vent Vertical Termination Three elbows MIN MAX + H 2 MAXPrior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Connecting the DV-46DVA-GCL Adapter to Appliance Top VentRear Vent Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning, Leveling And SecuringInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardTOP View 16 Noncombustible Facing Diagram Facing MaterialDoors TemplateElevated Hearth Systems Appliance Setup Install the Log Assembly Slot aMate slot C with tab C Mate slot with locating screw Install Louvers and Trim Install HoodAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-FLEX-TRAP SLP-TVHW SLP-CCS-BK SLP-DCF-BKSLK-SNKD DVP-FBHT Optional Wire Harness PVI-SLPSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLAt Depot Service Parts ListGas Fireplace DV #12 Valve Assembly Service PartsContact Information