Hearth and Home Technologies DV3732SBIL manual Rear Vent Vertical Termination One Elbow

Page 32

4.Rear Vent - Vertical Termination One Elbow

Note: Use DVP Series components only.

V1

 

V1 MIN.

H1 MAX.

1 ft.

 

305 mm

3-1/2 ft.

1.1 m

 

 

 

 

 

2 ft.

 

610 mm

5-1/2 ft.

1.7 m

 

 

 

 

 

3 ft.

 

914 mm

7-1/2 ft.

2.3 m

 

 

 

 

 

H MAX. = 7-1/2 ft. (2.3 m)

V1 + H1 MAX. = 40 ft. (12.2 m)

H1

Figure 7.16

Note: Use DVP Series components only.

Two Elbows

V1

H1 + H2 MAX

V1 MIN.

Back to back elbows

1/2 ft.

152 mm

 

 

 

 

2-1/2 ft.

762 mm

1 ft.

305 mm

 

 

 

 

4-1/2 ft.

1.4 m

2 ft.

610 mm

 

 

 

 

6-1/2 ft.

2.0 m

3 ft.

914 mm

 

 

 

 

H MAX. = 6-1/2 ft. (2 m)

V + H+ H1 MAX. = 40 ft. (12.2 m)

INSTALLED

HORIZONTALLY H1

H2

Figure 7.17

32

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

Image 32
Contents HOT Surfaces ModelsWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Decorative Doors and FrontsLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections MinimumMinimum FT. Maximum Minimum UnlimitedTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One Elbow Fire RiskInstalled Horizontally Top Vent Horizontal Termination Two ElbowsTop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two Elbows Three Elbows Minimum MaximumTop Vent Vertical Termination Four 90º Elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINPage Rear Vent Horizontal Termination Two Elbows MAX MIN + H 2 MAXRear Vent Vertical Termination One Elbow Rear Vent Vertical Termination Three elbows MIN MAX + H 2 MAXPrior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning, Leveling And SecuringInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Junction Box Installation Wall Switch Installation for Fan OptionalSplatter Guard To install the Splatter GuardFinishing To Close the Lower Access Panel To Remove the Splatter GuardTOP View 16 Noncombustible Facing Diagram Facing MaterialDoors TemplateElevated Hearth Systems Appliance Setup Install the Log Assembly Slot aMate slot C with tab C Mate slot with locating screw Install Louvers and Trim Install HoodAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV DVP-TB1 DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP  B. Vent Components Diagrams SL-2DVP SLK-SNKD DVP-FBHT SLP-CCS-BK SLP-DCF-BKSLP-FLEX-TRAP SLP-TVHW Optional Wire Harness PVI-SLPSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLGas Fireplace DV Service Parts ListAt Depot #12 Valve Assembly Service PartsContact Information