Hearth and Home Technologies DV3732SBIL manual Appliance Setup

Page 59

14 Appliance Setup

A. Remove Fixed Glass Assembly

See Section 14.G.

B. Remove the Shipping Materials

Remove shipping materials from inside or underneath the firebox.

C. Clean the Appliance

Clean/vacuum any sawdust that may have accumulated inside the firebox or underneath in the control cavity.

D. Accessories

Install approved accessories per instructions included with accessories. Contact your dealer for a list of ap- proved accessories.

WARNING! Risk of Fire and Electric Shock! Use ONLY Hearth & Home Technologies-approved optional acces- sories with this appliance. Using non-listed accessories could result in a safety hazard and will void the warranty.

RHEOSTAT

 

SWITCH

TEMPERATURE

 

 

SENSOR

Figure 14.1 Fan Wiring with Rheostat

 

VARIABLE

 

SPEED SWITCH

JUNCTION BOX

 

TEMPERATURE

 

SENSOR SWITCH

 

BLUE

 

Figure 14.2 Detail of Fan Wiring with Rheostat

E. Lava Rock, Rockwool/Ember Placement

WARNING! Risk of Explosion! Follow ember placement instructions in manual. DO NOT place embers directly over burner ports. Replace ember material annually. Improperly placed embers interfere with proper burner operation.

Placing the Lava Rock

See Section 14F for Lava Rock placement instructions.

Place lava rock on base pan. Do NOT place on burner top.

Placing the Ember Material

Ember material is shipped with this gas appliance. To place the ember material:

Embers CANNOT be placed directly over ports. See Figure 14.4 for the only exception to this guideline. Care should be taken not to cover the lighting trail of ports (from back to front).

When placing Glowing Embers® onto the burner care should be taken so that the ports are not covered. Place the dime-size ember pieces near the port holes in the burner top (see Figure 14.3). Failure to follow this pro- cedure will likely cause lighting and sooting problems.

Some of the small port holes should be covered with ember material. See Figure 14.4 for detail.

Save the remaining ember materials for use during appliance servicing. The embers provided should be enough for 3 to 5 applications.

Figure 14.3 Placement of Embers

PORT HOLES IN CIRCLED AREA

SHOULD BE COVERED WITH EMBER

MATERIAL. NO OTHER PORT HOLES

MAY COME INTO CONTACT WITH

EMBER MATERIAL.

Figure 14.4 Placement of Embers

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

59

Image 59
Contents HOT Surfaces ModelsWhat to do if you smell gas Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Firebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Unlimited Mantel and Wall ProjectionsMinimum Minimum FT. MaximumVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Fire Risk Vent Diagrams Top Vent Horizontal Termination One ElbowTop Vent Horizontal Termination Two Elbows Installed HorizontallyV1 Minimum H1 Maximum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 mMinimum Maximum Top Vent Vertical Termination Two Elbows Three ElbowsV1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Four 90º ElbowsPage MAX MIN + H 2 MAX Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow MIN MAX + H 2 MAX Rear Vent Vertical Termination Three elbowsTermination Cap Flue Damper Prior to installing the gas applianceCoaxial to Colinear Venting Clearances to CombustiblesRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning, Leveling And Securing Securing and Leveling the ApplianceAssemble Pipe Sections Installing Vent Pipe DVP and SLP PipeAttach Vent to the Firebox Assembly Assemble Vent Sections DVP Pipe OnlyAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Wall Switch Installation for Fan Optional Junction Box InstallationSplatter Guard To install the Splatter GuardFinishing To Remove the Splatter Guard To Close the Lower Access PanelTOP View Facing Material 16 Noncombustible Facing DiagramTemplate DoorsElevated Hearth Systems Appliance Setup Slot a Install the Log AssemblyMate slot C with tab C Mate slot with locating screw Air Shutter Settings Install Louvers and TrimInstall Hood Air Shutter SettingIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAPCOOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLDVP-TV DVP-TB1 DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP  B. Vent Components Diagrams SL-2DVP SLK-SNKD DVP-FBHT SLP-CCS-BK SLP-DCF-BKSLP-FLEX-TRAP SLP-TVHW LINK-DV30B DVP-2SL DV-46DVA-GCL Optional Wire HarnessPVI-SLP SLP-LPCGas Fireplace DV Service Parts ListAt Depot Service Parts #12 Valve AssemblyContact Information