B. Vent Components Diagrams (continued)

Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required.

8 in. (203 mm)

Heat

Shield

15-1/8 in.

(384 mm)

 

Max

12 in.

Effective

(305 mm)

Length

SLP-TRAP

Horizontal Termination Cap

Term Cap

Minimum

Maximum

Effective Length

Effective Length

 

Trap1

3-1/8 in.

4-3/4 in.

79 mm

121 mm

 

Trap2

5-1/4 in.

9-1/4 in.

133 mm

235 mm

 

6-11/16 in.

3-15/16 in.

(169 mm)

(101 mm)

3-15/16 in.

3-13/16 in.

(101 mm)

(97 mm)

5-1/16 in.

8 in. (128 mm)

(203 mm)

SL-2DVP

Adapter

26in.

660mm

DVP-HSM-B

Extended Heat Shield

6-3/8 in.

163 mm

4 in.

4-5/8 in.

102 mm

117 mm

8-1/8 in.

206 mm

DVP-2SL

Adapter

14-7/16 in.

367 mm

14-7/16 in.

367 mm

SLP-WT-BK

Wall Thimble-Black

4-3/16 in. 106 mm

5-1/16 in. 128 mm

2-5/16 in. 59 mm

Figure 16.9 SLP Series Vent Components

72

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

Image 72
Contents Models What to do if you smell gasHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Decorative Doors and FrontsLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections MinimumMinimum FT. Maximum Minimum UnlimitedTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One Elbow Fire RiskInstalled Horizontally Top Vent Horizontal Termination Two ElbowsTop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two Elbows Three Elbows Minimum MaximumTop Vent Vertical Termination Four 90º Elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINPage Rear Vent Horizontal Termination Two Elbows MAX MIN + H 2 MAXRear Vent Vertical Termination One Elbow Rear Vent Vertical Termination Three elbows MIN MAX + H 2 MAXPrior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning, Leveling And SecuringInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Junction Box Installation Wall Switch Installation for Fan OptionalTo install the Splatter Guard FinishingSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardTOP View 16 Noncombustible Facing Diagram Facing MaterialDoors TemplateElevated Hearth Systems Appliance Setup Install the Log Assembly Slot aMate slot C with tab C Mate slot with locating screw Install Louvers and Trim Install HoodAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-CCS-BK SLP-DCF-BK SLP-FLEX-TRAP SLP-TVHWSLK-SNKD DVP-FBHT Optional Wire Harness PVI-SLPSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLService Parts List At DepotGas Fireplace DV #12 Valve Assembly Service PartsContact Information