C. Install the Ceiling Firestop

A ceiling firestop MUST be used between floors and attics.

DVP pipe only - Frame an opening 10 in. by 10 in. (254 mm by 254 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

SLP pipe only - Frame opening 9 in. x 9 in. (229 mm x 229 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

Frame the area with the same sized lumber as used in ceiling/floor joist.

The ceiling firestop may be installed above or below the ceiling joists when installed with a attic insulation shield. It must be under joists between floors that are not insulated. Refer to Figure 8.4.

Secure with three fasteners on each side.

WARNING! Risk of Fire! DO NOT pack insu- lation around the vent. Insulation must be kept back from the pipe to prevent overheating.

 

ATTIC ABOVE

 

A

 

A

PIPE

A

DVP

10 in. (254 mm)

SLP

9 in. (229 mm)

Figure 6.3

 

INSTALL ATTIC INSULATION SHIELDS

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

3 FASTENERS

PER SIDE

CEILING FIRESTOP

CEILING FIRESTOP

INSTALLED BELOW CEILING

INSTALLED ABOVE CEILING

Figure 6.4 Installing the Attic Shield

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

37

Image 37
Contents What to do if you smell gas ModelsHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Mantel and Wall ProjectionsMinimum FT. Maximum Minimum UnlimitedVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Fire Risk Vent Diagrams Top Vent Horizontal Termination One ElbowTop Vent Horizontal Termination Two Elbows Installed HorizontallyV1 Minimum H1 Maximum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 mMinimum Maximum Top Vent Vertical Termination Two Elbows Three ElbowsV1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Four 90º ElbowsPage MAX MIN + H 2 MAX Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow MIN MAX + H 2 MAX Rear Vent Vertical Termination Three elbowsCoaxial to Colinear Venting Prior to installing the gas applianceClearances to Combustibles Termination Cap Flue DamperConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Connecting the DV-46DVA-GCL Adapter to Appliance Top VentRear Vent Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning, Leveling And Securing Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Wall Switch Installation for Fan Optional Junction Box InstallationFinishing To install the Splatter GuardSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelTOP View Facing Material 16 Noncombustible Facing DiagramTemplate DoorsElevated Hearth Systems Appliance Setup Slot a Install the Log AssemblyMate slot C with tab C Mate slot with locating screw Install Hood Install Louvers and TrimAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDDVP-TV SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-FLEX-TRAP SLP-TVHW SLP-CCS-BK SLP-DCF-BKSLK-SNKD DVP-FBHT PVI-SLP Optional Wire HarnessSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLAt Depot Service Parts ListGas Fireplace DV Service Parts #12 Valve AssemblyContact Information