Hearth and Home Technologies DV3732SBIL manual Covered Alcove Applications

Page 21

C

 

 

F

 

 

 

V

 

 

 

J

B

 

 

 

B

 

 

V

B

 

V

 

D

 

V

G

 

 

V

M

 

 

A

V

V= VENT TERMINAL X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

X

H or i

V

H

V H V

E

V

A

O

N

P

R

Q

 

 

V

 

 

 

 

 

L

 

 

V

K

Electrical

K

V

 

 

Service

 

 

 

 

 

 

 

 

C

V

A

=

12 inches

.................clearances above grade, veranda,

 

 

 

porch, deck or balcony

B

=

12 inches

.................clearance to window or door that may

 

 

 

be opened, or to permanently closed

 

 

 

window

C

=

18 inches

.................clearance below unventilated soffit

 

 

18 inches

.................clearance below ventilated soffit

30inches .................clearance below vinyl soffits and electrical service

D

=

6 inches

clearance to outside corner

E

=

6 inches

clearance to inside corner

F

=

3 ft. (Canada)

not to be installed above a gas me-

 

 

 

ter/regulator assembly within 3 feet

 

 

 

horizontally from the center-line of the

 

 

 

regulator

G

=

3 ft

clearance to gas service regulator

 

 

 

vent outlet

H

= 12 inches

clearance to non-mechanical (unpow-

 

 

 

ered) air supply inlet, combustion air

i

=

3 ft. (U.S.A.)

inlet or direct-vent termination

 

 

 

6 ft. (Canada)

clearance to a mechanical (powered)

 

 

 

air supply inlet

All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below termination.

J

= 7 ft

On public property: clearance above

 

 

paved sidewalk or a paved driveway.

A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

Covered Alcove Applications

(Spaces open only on one side and with an overhang)

N= 6 inches ........... non-vinyl sidewalls 12 inches ......... vinyl sidewalls

O= 18 inches ......... non-vinyl soffit and overhang

42 inches

......... vinyl soffit and overhang

P = 8 ft.

 

 

 

 

 

 

 

 

QMIN

RMAX

1 cap

 

3 feet

2 x Q ACTUAL

2 caps

 

6 feet

1 x Q ACTUAL

3 caps

 

9 feet

2/3 x Q ACTUAL

4 caps

 

12 feet

1/2 x Q ACTUAL

 

 

 

 

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

K

=

6 inches

clearance from sides of electrical

 

 

 

service

L

=

12 inches

clearance above electrical service

Location of the vent termination must not interfere with access to the electrical service.

M = 18 inches

clearanceunderveranda,porch,deck,

 

balcony or overhang

42 inches

vinyl or composite overhang

Permitted when veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor.

Figure 6.3 Minimum Clearances for Termination

CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, traffic areas or where people may pass or gather (sidewalk, deck, patio, etc.). Listed cap shields available. Contact your dealer.

Local codes or regulations may require different clearances.

Vent system termination is NOT permitted in screened porches.

Vent system termination is permitted in porch areas with two or more sides open.

Hearth & Home Technologies assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

Vinyl protection kits are suggested for use with vinyl siding.

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

21

Image 21
Contents Models What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Gas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Mantel and Wall ProjectionsMinimum FT. Maximum Minimum UnlimitedVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Fire Risk Vent Diagrams Top Vent Horizontal Termination One ElbowTop Vent Horizontal Termination Two Elbows Installed HorizontallyV1 Minimum H1 Maximum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 mMinimum Maximum Top Vent Vertical Termination Two Elbows Three ElbowsV1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Four 90º ElbowsPage MAX MIN + H 2 MAX Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow MIN MAX + H 2 MAX Rear Vent Vertical Termination Three elbowsCoaxial to Colinear Venting Prior to installing the gas applianceClearances to Combustibles Termination Cap Flue DamperConnecting the DV-46DVA-GCL Adapter to Appliance Top Vent Connecting the LINK-DV30B to the DV-46DVA-GCL adapterRear Vent Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning, Leveling And Securing Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall Components SLP onlyHeat Shield Requirements for Horizontal Termination DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Wall Switch Installation for Fan Optional Junction Box InstallationTo install the Splatter Guard FinishingSplatter Guard To Remove the Splatter Guard To Close the Lower Access PanelTOP View Facing Material 16 Noncombustible Facing DiagramTemplate DoorsElevated Hearth Systems Appliance Setup Slot a Install the Log AssemblyMate slot C with tab C Mate slot with locating screw Install Hood Install Louvers and TrimAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDDVP-TV DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-CCS-BK SLP-DCF-BK SLP-FLEX-TRAP SLP-TVHWSLK-SNKD DVP-FBHT PVI-SLP Optional Wire HarnessSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLService Parts List At DepotGas Fireplace DV Service Parts #12 Valve AssemblyContact Information