Hearth and Home Technologies DV3732SBIL manual Top Vent Vertical Termination Four 90º Elbows

Page 29

2. Top Vent - Vertical Termination - (continued)

Four 90º Elbows

Note: Use SLP Series components only.

V1 MIN.

H1 MAX.

V2 MIN.

H2 MAX.

V3 MIN.

1-1/2 ft.

457 mm

4 ft.

1.2 m

4 ft.

1.2 m

4 ft.

1.2 m

3-1/2 ft.

1.0 m

V1 + V2 + V3 + H1 + H2 Maximum= 40 ft. (12.2 m)

Note: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installation (see Figure 7.3).

V3

H2

H1

V1

V2

Figure 7.11

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

29

Image 29
Contents HOT Surfaces ModelsWhat to do if you smell gas Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupFinishing Reference MaterialsLimited Lifetime Warranty Limited Lifetime Warranty Hearth & Home Technologies IncWarranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Decorative Doors and FrontsFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianLogs FireboxTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Selecting Appliance Location Framing and ClearancesClearances Constructing the Appliance ChaseMinimum Mantel and Wall ProjectionsMinimum FT. Maximum Minimum UnlimitedVent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Fire Risk Vent Diagrams Top Vent Horizontal Termination One ElbowTop Vent Horizontal Termination Two Elbows Installed HorizontallyV1 Minimum H1 Maximum H1 + H2 Maximum Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 mMinimum Maximum Top Vent Vertical Termination Two Elbows Three ElbowsV1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Four 90º ElbowsPage MAX MIN + H 2 MAX Rear Vent Horizontal Termination Two ElbowsRear Vent Vertical Termination One Elbow MIN MAX + H 2 MAX Rear Vent Vertical Termination Three elbowsCoaxial to Colinear Venting Prior to installing the gas applianceClearances to Combustibles Termination Cap Flue DamperRear Vent Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe DVP SLP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear Vent13 Proper Positioning, Leveling And Securing Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent Pipe DVP and SLP PipeAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Slip Sections Assemble Vent Sections SLP Pipe OnlyDisassemble Vent Sections Secure the Vent SectionsInstall Decorative Ceiling Components SLP only Assemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Decorative Wall Components SLP only DVP-HPC1 DVP-HPC2 Install Horizontal Termination Cap DVP and SLP PipeFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Wall Switch Installation for Fan Optional Junction Box InstallationSplatter Guard To install the Splatter GuardFinishing To Remove the Splatter Guard To Close the Lower Access PanelTOP View Facing Material 16 Noncombustible Facing DiagramTemplate DoorsElevated Hearth Systems Appliance Setup Slot a Install the Log AssemblyMate slot C with tab C Mate slot with locating screw Install Hood Install Louvers and TrimAir Shutter Setting Air Shutter SettingsIntellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Ues to spark, and main Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP vent components DVP-TRAPBEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDDVP-TV DVP-TB1 DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP  B. Vent Components Diagrams SL-2DVP SLK-SNKD DVP-FBHT SLP-CCS-BK SLP-DCF-BKSLP-FLEX-TRAP SLP-TVHW PVI-SLP Optional Wire HarnessSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLGas Fireplace DV Service Parts ListAt Depot Service Parts #12 Valve AssemblyContact Information