Hearth and Home Technologies DV3732SBIL manual Junction Box Installation

Page 52

E. Junction Box Installation

If the box is being wired from the INSIDE of the appli- ance:

Remove the screw attaching the junction box/receptacle to the outer shell, rotate the junction box inward to dis- engage it from the outer shell (see Figure 12.3).

Pull the electrical wires from outside the appliance through the opening into the valve compartment and secure wires with a Romex connector. See Figure 12.3.

Make all necessary wire connections to the junction box/receptacle and reattach the junction box/receptacle to the outer shell.

F. Wall Switch Installation for Fan (Optional)

If the box is being wired to a wall mounted switch for use with a fan (See Figure 12.4):

The power supply for the appliance must be brought into a switch box.

The power can then be supplied from the switch box to the appliance using a minimum of 14-3 with ground wire.

At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown.

At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown.

Add a 1/4 in. insulated female connector to the red (switch leg) wire, route it through the knockout in the face of the junction box, and connect to the top fan switch connector (1/4 in. male) as shown.

 

Romex

 

Connector

 

14/2WG

 

Cover Plate

 

outside firebox

WHT

 

BLK

 

WHT

 

BLK

Copper

 

GRN wire

ground attached

to GRN screw with

inside box

 

GRN wire

NOTICE: DO NOT wire

110 VAC to wall switch.

Figure 12.3 Junction Box Detail

 

Minimum 14-3 AWG

 

Switch

 

 

with Ground

 

 

 

Red

 

 

Black

Black

 

White

White

Junction Box

Green

Green

Red Black White Green

 

 

 

Switch Box

Power

 

Supply

 

 

 

 

Wires

 

Knockout

 

Red

 

 

Figure 12.4 Junction Box Wired to Wall Switch or BC10

52

Hearth & Home Technologies • DV3732SBI, DV3732SBIL • 2215-900 Rev. F • 9/12

Image 52
Contents What to do if you smell gas ModelsHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingFinishing Reference MaterialsLimited Lifetime Warranty Hearth & Home Technologies Inc Limited Lifetime WarrantyLimited Lifetime Warranty Warranty ConditionsListing and Code Approvals Requirements for the Commonwealth of Massachusetts Operating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Decorative Doors and FrontsLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionLogs FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase ClearancesMantel and Wall Projections MinimumMinimum FT. Maximum Minimum UnlimitedTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One Elbow Fire RiskInstalled Horizontally Top Vent Horizontal Termination Two ElbowsTop Vent Horizontal Termination Three Elbows V1 Minimum H1 Maximum H1 + H2 MaximumTop Vent Vertical Termination No Elbows V1 = 60 ft. Max .3 m Exhaust restrictor InstructionsTop Vent Vertical Termination Two Elbows Three Elbows Minimum MaximumTop Vent Vertical Termination Four 90º Elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINPage Rear Vent Horizontal Termination Two Elbows MAX MIN + H 2 MAXRear Vent Vertical Termination One Elbow Rear Vent Vertical Termination Three elbows MIN MAX + H 2 MAXPrior to installing the gas appliance Coaxial to Colinear VentingClearances to Combustibles Termination Cap Flue DamperConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Connecting the DV-46DVA-GCL Adapter to Appliance Top VentRear Vent Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVP SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance 13 Proper Positioning, Leveling And SecuringInstalling Vent Pipe DVP and SLP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections DVP Pipe Only Assemble Pipe SectionsAssemble Vent Sections SLP Pipe Only Assemble Slip SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Decorative Ceiling Components SLP only Install Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components SLP only Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap DVP and SLP Pipe DVP-HPC1 DVP-HPC2Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Junction Box Installation Wall Switch Installation for Fan OptionalFinishing To install the Splatter GuardSplatter Guard To Close the Lower Access Panel To Remove the Splatter GuardTOP View 16 Noncombustible Facing Diagram Facing MaterialDoors TemplateElevated Hearth Systems Appliance Setup Install the Log Assembly Slot aMate slot C with tab C Mate slot with locating screw Install Louvers and Trim Install HoodAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Ues to spark, and main Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP DVP vent componentsRF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDDVP-TV SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-HRC-SS DVP-HRC-ZC-SS Horizontal Termination CAPDVP-TB1  B. Vent Components Diagrams SL-2DVP SLP-FLEX-TRAP SLP-TVHW SLP-CCS-BK SLP-DCF-BKSLK-SNKD DVP-FBHT Optional Wire Harness PVI-SLPSLP-LPC LINK-DV30B DVP-2SL DV-46DVA-GCLAt Depot Service Parts ListGas Fireplace DV #12 Valve Assembly Service PartsContact Information