Aarrow Fires Gas Stove user manual Assemble Receiver, Slot

Page 20

INSTALLATION INSTRUCTIONS

ASSEMBLE RECEIVER

Important

The remote system is intended for use with original Aarrow parts only.

1)Carefully push the multi block connector on to the connection within the reciever unit as shown in Fig 17a. This connector can only fit one way, so ensure the slot in the recievers board lines up with the mould- ing within the multi block connection.

SLOT

Fig. 17a

Fig. 17b

2)Next, connect the angled spade connectors to the motor, note there are two different sized connectors and these can only be fitted to the appropriate sized spade tab. The remaining narrow spade connectors fit to the spade tabs on the micro switch. These are not handed, see Fig. 17b.

3)Place the double sided adhesive tape to the underside of the reciever unit. Slide back the cover and insert the 4x AA/LR6 1.5v batteries into unit, observing the correct polartity as marked on the unit. Re-place cover. Fig. 17c.

CAUTION! Ensure the batteries are inserted AFTER the motor is wired. A short circuit can destroy the electrical components.

4)Position the reciever unit, as shown in Fig. 17d onto the space provided on the valve bracket. Affix the underside of the unit with the double sided tape. Take care to route the wiring harness away from any hot parts and do not obstruct the valve controls. The reciever unit works by ultrasonic so ensure that the reciev- ing round grill is facing to the front of the stove.

Fig. 17d

Fig. 17c

20

Aarrow Sherborne GSL CF

Image 20
Contents Sherborne GSL Spare Parts ContentsGuarantee General Information Installation InstructionsSafety Notices Stove location Packed detailsUnpacking note Fit for purposeMain Box Certification Installation Instructions Important NoticesStatutory Requirements Installation Instructions Technical Data Installing the StoveMax. Heat Setting Min. Heat SettingStove Location Installation Instructions Preparation of the StoveStove must not be installed against a combustible wall Installation Instructions Shelf Clearances Non-Combustible shelf clearancesInstallation Instructions Flue System TOP Flue Options Closure PlatesRear Flue Options =See Graph Installation Instructions Connecting the GAS Supply Pressure Test SequenceFitting and Arranging the Coals Both NG & LPG versions How to arrange the logs Fitting and Arranging the Logs NG onlyFitting and Arranging the Logs LPG only Installation Instructions Installation of Remote Control System For a Manual Stove Without Remote Control Proceed toAssemble Motor Assemble Receiver SlotHandset Fire Testing Commissioning the StoveAdvise the end user Checklist Servicing Replacement of the Glass Burner and Valve Assembly Removal ServicingSee Safety Notices ref coal set Servicing Annual ServiceCleaning Outer Surfaces Fault Diagnosis OSD PilotAnnual Service Record Date of Visit Company Work Carried Out SignatureAdditional Notes User Instructions User Instructions Lighting & Controlling the Fire Do not try to force the control, wait the 60 seconds User InstructionsTo turn the stove and the pilot off Temperature Display Remote Control Thermostat and Timer Remote Control Programming the Desired Set TemperatureProgramming the Timer Set the display from *C/24 h to *F/12 h and vice versaAutomatic Mode Auto in display for Temperature Control User Instructions User Instructions Important Notices User Instructions Shelf Clearances Spare Parts Part Description Visual Aid Part NumberSpare Parts AFGS010 Options & Accessories RemoteshbTraceshb AocshbGuarantee Please complete the following for you own recordsAdditional Notes ’ve checked it and it’s O.K