Aarrow Fires Gas Stove user manual Servicing, Burner and Valve Assembly Removal

Page 26

SERVICING

Step 7 Clear inside of stove of any debris.

Step 8 To re-assemble reverse this procedure. See initial note on page 25.

Note:When relocating the body and canopy assembly ensure the front location tab is engaged in the chassis.

BURNER AND VALVE

ASSEMBLY REMOVAL

Please note! When handling the burner assembly be aware of the sharp points of the self tapping screws on the underside

Ensure the appliance is cold.

Step 1 Isolate the gas supply from the stove

Step 2 Disconnect the supply inlet pipe by releasing the pipe nut at the rear of the valve, see page 13.

Step 3 Remove the outer body of the stove (Ref Page 25).

Step 4 Remove the dummy fuel retainer and then the glass frame assembly (Ref Page 25).

Step 5 Remove the coals or logs.

Step 6 Remove the base coal matrix (four pieces) Take care not to damage the matrix, (Page 14).

Step 7 Remove the two self tapping screws each side of the injector as shown below.

The burner assembly may now be removed. Slide back off the injector and lift the burner assembly upwards from the rear while at the same time pivoting it towards you. Take care not to damage the injector.

Step 8 To remove the valve assembly undo the 3x Pozi M5 screws, located within the fire box (2x to the front of the burner and 1x centrually to the rear of the burner), lift upwards from the rear while at the same time pivoting it towards you. Carefully guide the controls through aperture clear of the stove.

After replacement of burner assembly, ensure that a check on the gas tightness of any new joint is carried out.

26

Aarrow Sherborne GSL CF

Image 26
Contents Sherborne GSL Spare Parts ContentsGuarantee General Information Installation InstructionsSafety Notices Unpacking note Stove locationPacked details Fit for purposeMain Box Certification Installation Instructions Important NoticesStatutory Requirements Max. Heat Setting Installation Instructions Technical DataInstalling the Stove Min. Heat SettingStove Location Installation Instructions Preparation of the StoveStove must not be installed against a combustible wall Installation Instructions Shelf Clearances Non-Combustible shelf clearancesInstallation Instructions Flue System TOP Flue Options Closure PlatesRear Flue Options =See Graph Installation Instructions Connecting the GAS Supply Pressure Test SequenceFitting and Arranging the Coals Both NG & LPG versions How to arrange the logs Fitting and Arranging the Logs NG onlyFitting and Arranging the Logs LPG only Installation Instructions Installation of Remote Control System For a Manual Stove Without Remote Control Proceed toAssemble Motor Assemble Receiver SlotHandset Fire Testing Commissioning the StoveAdvise the end user Checklist Servicing Replacement of the Glass Burner and Valve Assembly Removal ServicingSee Safety Notices ref coal set Servicing Annual ServiceCleaning Outer Surfaces Fault Diagnosis OSD PilotAnnual Service Record Date of Visit Company Work Carried Out SignatureAdditional Notes User Instructions User Instructions Lighting & Controlling the Fire Do not try to force the control, wait the 60 seconds User InstructionsTo turn the stove and the pilot off Temperature Display Remote Control Programming the Timer Thermostat and Timer Remote ControlProgramming the Desired Set Temperature Set the display from *C/24 h to *F/12 h and vice versaAutomatic Mode Auto in display for Temperature Control User Instructions User Instructions Important Notices User Instructions Shelf Clearances Spare Parts Part Description Visual Aid Part NumberSpare Parts AFGS010 Traceshb Options & AccessoriesRemoteshb AocshbGuarantee Please complete the following for you own recordsAdditional Notes ’ve checked it and it’s O.K