Aarrow Fires Gas Stove user manual Installation Instructions Technical Data, Installing the Stove

Page 7

INSTALLATION INSTRUCTIONS

TECHNICAL DATA

Gas Type

Natural

LPG

Gas

 

 

 

 

 

Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I2H

 

 

 

 

I3P

 

 

 

 

 

 

Category

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Supply

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20mbar

 

 

 

 

 

37mbar

 

 

 

 

 

Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Injector

 

Bray 82/400

 

 

 

 

Bray 82/160

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Max. Heat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Setting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Input

 

6.1 kW

 

 

 

 

5.7kW

 

 

 

 

(gross)

 

 

 

 

 

 

 

 

 

Gas Rate

 

0.55m3/hour

 

 

 

 

0.21m3/hour

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Min. Heat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Setting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Heat Input

 

2.5 kW

 

 

 

 

2.5kW

 

 

 

 

(gross)

 

 

 

 

 

 

 

 

 

Gas Rate

 

0.23m3/hour

 

 

 

 

0.09m3/hour

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Efficiency

 

CLASS 2

 

 

 

 

CLASS 2

 

 

 

Class

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOx Class

 

 

 

Unclassified

 

 

 

 

 

Unclassified

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AT,DK,ES,FI,

 

 

 

 

 

 

 

 

 

 

 

 

ES,FR,GB,

 

 

 

Country Of

 

 

 

 

 

 

 

GB,GR,IE,IT,

 

 

GR,IE,IT,PT

 

 

 

 

 

Use

 

 

 

 

 

 

 

 

NO,PT,SE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gas Council

32-248-06

 

32-248-07

 

 

 

 

 

 

 

Id Number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 1

Fig. 3

INSTALLING THE STOVE

A CORGI qualified gas engineer MUST install the stove in accordance with the following regulations and stan- dards:-

The Gas Safety (Installation and Use) Regulations current edition.

The Building Regulations for England and Wales 2000 ref; Approved Document J 2002 edition (issued by the DTLR).

The Building Standards (Scotland) (Consolidation) Regulations.

BS5440 parts 1 and 2 BS5871 And these Installation Instructions.

Warning: Failure to comply with the regulations, requirements, or these instructions will invalidate the guarantee and could have hazardous consequences.

IMPORTANT

Please note that in tight recesses the gas supply point may be inaccessible. Therefore it may be necessary to route the pipe for the gas supply before installing the stove into its recess.

Aarrow Sherborne GSL CF

7

Image 7
Contents Sherborne GSL Guarantee ContentsSpare Parts Safety Notices Installation InstructionsGeneral Information Fit for purpose Stove locationPacked details Unpacking noteMain Box Statutory Requirements Installation Instructions Important NoticesCertification Min. Heat Setting Installation Instructions Technical DataInstalling the Stove Max. Heat SettingStove must not be installed against a combustible wall Installation Instructions Preparation of the StoveStove Location Non-Combustible shelf clearances Installation Instructions Shelf ClearancesInstallation Instructions Flue System Rear Flue Options Closure PlatesTOP Flue Options =See Graph Pressure Test Sequence Installation Instructions Connecting the GAS SupplyFitting and Arranging the Coals Both NG & LPG versions Fitting and Arranging the Logs NG only How to arrange the logsFitting and Arranging the Logs LPG only Installation Instructions For a Manual Stove Without Remote Control Proceed to Installation of Remote Control SystemAssemble Motor Slot Assemble ReceiverHandset Commissioning the Stove Fire TestingAdvise the end user Checklist Servicing Replacement of the Glass Servicing Burner and Valve Assembly RemovalCleaning Outer Surfaces Servicing Annual ServiceSee Safety Notices ref coal set OSD Pilot Fault DiagnosisDate of Visit Company Work Carried Out Signature Annual Service RecordAdditional Notes User Instructions User Instructions Lighting & Controlling the Fire To turn the stove and the pilot off User InstructionsDo not try to force the control, wait the 60 seconds Temperature Display Remote Control Set the display from *C/24 h to *F/12 h and vice versa Thermostat and Timer Remote ControlProgramming the Desired Set Temperature Programming the TimerAutomatic Mode Auto in display for Temperature Control User Instructions User Instructions Important Notices User Instructions Shelf Clearances Part Description Visual Aid Part Number Spare PartsSpare Parts AFGS010 Aocshb Options & AccessoriesRemoteshb TraceshbPlease complete the following for you own records GuaranteeAdditional Notes ’ve checked it and it’s O.K