Aarrow Fires Gas Stove user manual Installation Instructions

Page 17

INSTALLATION INSTRUCTIONS

5) The remaining 3X small twigs are placed as shown in Fig. 14d. The LPG log layout is now complete.

Fig. 14a

 

3) Place the curved log to the left hand side of the

 

firebox, rest the top of this log onto the top of the

 

Y shaped open end of the rear log. Take the

Fig. 14d

straight log and position this to the right hand side

 

of the firebox, again rest the rear of this log onto

 

the rear Y shaped log, opposite end to the curved

 

log. Note, rest both fronts of these end logs

 

against the front corners of the burner.See Fig.14b.

 

Fig. 14b

4) Next place the 2x large twigs into the layout with the base of each twig central about the stove opening and placed to the front of the stove. The tops of these twigs radiate out from the base to form a vee shape and rest upon the rear Y log (left hand) and straight log (right hand). The medium twig is placed between the large twigs as shown in Fig. 14c.

Fig. 14c

Aarrow Sherborne GSL CF

17

Image 17
Contents Sherborne GSL Spare Parts ContentsGuarantee General Information Installation InstructionsSafety Notices Packed details Stove locationUnpacking note Fit for purposeMain Box Certification Installation Instructions Important NoticesStatutory Requirements Installing the Stove Installation Instructions Technical DataMax. Heat Setting Min. Heat SettingStove Location Installation Instructions Preparation of the StoveStove must not be installed against a combustible wall Non-Combustible shelf clearances Installation Instructions Shelf ClearancesInstallation Instructions Flue System TOP Flue Options Closure PlatesRear Flue Options =See Graph Pressure Test Sequence Installation Instructions Connecting the GAS SupplyFitting and Arranging the Coals Both NG & LPG versions Fitting and Arranging the Logs NG only How to arrange the logsFitting and Arranging the Logs LPG only Installation Instructions For a Manual Stove Without Remote Control Proceed to Installation of Remote Control SystemAssemble Motor Slot Assemble ReceiverHandset Commissioning the Stove Fire TestingAdvise the end user Checklist Servicing Replacement of the Glass Servicing Burner and Valve Assembly RemovalSee Safety Notices ref coal set Servicing Annual ServiceCleaning Outer Surfaces OSD Pilot Fault DiagnosisDate of Visit Company Work Carried Out Signature Annual Service RecordAdditional Notes User Instructions User Instructions Lighting & Controlling the Fire Do not try to force the control, wait the 60 seconds User InstructionsTo turn the stove and the pilot off Temperature Display Remote Control Programming the Desired Set Temperature Thermostat and Timer Remote ControlProgramming the Timer Set the display from *C/24 h to *F/12 h and vice versaAutomatic Mode Auto in display for Temperature Control User Instructions User Instructions Important Notices User Instructions Shelf Clearances Part Description Visual Aid Part Number Spare PartsSpare Parts AFGS010 Remoteshb Options & AccessoriesTraceshb AocshbPlease complete the following for you own records GuaranteeAdditional Notes ’ve checked it and it’s O.K