American Water Heater HCG3 130T 300 Installation Considerations, Rough In Dimensions

Page 10

Installation Considerations

Rough In Dimensions

70°

20°

S

GA

35°

 

1 1/4” SUPPLY GAS

4” PVC

 

INTAKE AIR

 

 

CONNECTION

CONNECTION

VENT

 

 

4

INCH

 

 

PVC

BACK

69”

 

 

(175.3 cm)

FRONT

T & P

 

 

 

 

 

 

 

 

69”

 

 

 

 

 

 

 

(175.3 cm)

 

 

INTAKE AIR

 

 

 

 

 

 

 

4 INCH PVC

 

 

 

TOP

 

 

 

 

 

 

 

 

 

 

*1 1/2” NPT

 

 

 

 

 

 

 

WATER

 

 

T

E

 

 

 

OUTLET

 

 

&

V

 

 

 

 

 

PA

 

 

 

 

 

 

 

L

 

 

 

 

VALVE

 

 

V

 

 

 

T

FRONT

 

 

 

 

 

U

 

 

 

 

 

 

O

 

 

 

 

 

 

EAN

DRAIN

 

 

 

 

 

CL

 

 

 

 

 

 

 

 

 

 

 

 

12”

 

 

 

 

18°

 

45°

 

 

 

 

 

(30.5 cm)

45°

4” PVC

VENT CONNECTION

(exhaust elbow)

CONDENSATE

DRAIN CONNECTION

1/2 INCH PVC

WATER OUTLET HEIGHT

63INCHES (160 cm)

33.12” (84.1 cm)

OUTSIDE

DIAMETER

CLEANOUT

3/4” NPT

DRAIN

1 1/2” NPT

WATER INLET

75.50”

(191.8 cm)

50.77”

(129 cm)

4.86”

(12.34 cm)

* Center line of water outlet on top of the water heater is 7 inches from the front edge of the water heater.

Figure 6

These designs comply with the current edition of the American National Standard for Gas Water Heaters, Volume III, ANSI Z21.10.3 / CSA 4.3 as an automatic circulating tank water heater, and automatic storage water heaters.

Gas Line Connection Size

Table 1

Model

Series

Natural Gas

Propane Gas

(A)HCG3 130T 300

100/101

1 1/4” NPT

1 1/4” NPT

(A)HCG3 130T 400

100/101

1 1/4” NPT

1 1/4” NPT

This table shows connections sizes only - see Table 5 on page 13 for minimum required supply gas line sizes. Depending on the installed equivalent length, and/or the number of appliances connected, the supply gas line size may have to be increased beyond the minimum required sizes - see Gas Line Sizing on page 37.

Table 2

Model

U.S. Gallons

Liters

 

 

 

 

ASME

Standard

ASME

Standard

 

 

 

 

 

 

(A)HCG-130300

130

119.9

492

453.8

 

 

 

 

 

(A)HCG-130400

130

119.9

492

453.8

(A)HCG-130500

130

119.9

492

453.8

 

 

 

 

 

Storage Capacities

Recovery Capacities

Table 3

 

 

 

 

 

 

 

U. S. Gallons/Hr & Liters/Hr at Temperature Rise Indicated

 

 

Model

Type of

Input

 

°F

20°F

30°F

40°F

50°F

60°F

70°F

80°F

90°F

100°F

110°F

120°F

130°F

140°F

Gas

Btu/hr

kW

°C

11°C

17°C

22°C

28°C

33°C

39°C

44°C

50°C

56°C

61°C

67°C

72°C

78°C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(A)HCG 130T

Natural

300,000

88

GPH

1746

1164

873

699

582

499

436

388

349

318

291

269

250

300

Propane

LPH

6610

4406

3304

2644

2203

1888

1652

1469

1322

1201

1102

1017

945

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(A)HCG3 130T

Natural

399,900

117

GPH

2328

1552

1164

931

776

665

582

517

466

423

388

359

332

400

Propane

LPH

8813

5875

4406

3525

2938

2518

2203

1958

1763

1602

1469

1356

1259

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recovery capacities are based on 96% thermal efficiency.

10

Image 10
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional Precautions General Safety InformationHydrogen Gas Flammable Fire or Explosion Hazard Fire and Explosion HazardIntroduction Preparing For The InstallationQualified Installer or Service Agency Abbreviations UsedFeatures And Components Basic OperationTop View Top View ComponentsSide Views Recovery Capacities Installation ConsiderationsRough In Dimensions Gas Line Connection SizeClearance To Combustible Materials Service ClearanceLocating The Water Heater Intake Air and Vent Pipe ClearancesHard Water Extended Vent TerminationsOptional Concentric Terminations Circulation PumpsGas Pressure Requirements Installation RequirementsPower Supply Supply Gas LineClosed Water Systems Mixing ValvesDishwashing Machines Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsContaminated Air Condensate DrainCombustible Material Storage Condensate Drain Water TrapUnconfined Space Air RequirementsConfined Space Outdoor Air Through One Opening Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Vertical Termination Installation Intake AIR Screen Balance PlateVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationConcentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Vent Pipe is 4 Inch Schedule 40 PVCFour Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentInstallation Notes Water Heater InstallationCondensate Drain Installation Installation InstructionsSupply Gas Line Sizing U. S. Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing Metric UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Enable/Disable Circuit Electrical WiringPower Supply Connections Connecting An External Supervisory ControlValve Discharge Pipe Water Piping DiagramsWater Line Connections Thermometers not SuppliedHigh Temperature Applications Temperature RegulationHigh Temperature Limit Control ECO Thermostat ControlControl System Navigation Control System OperationOverview User Input ButtonsStatus Icons Icon DescriptionControl System Menus Operating StatesState Description Menu DescriptionBack Help User Settings & Control System MenusUpdate Cancel Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayECO Back AdvancedView Back Help YESSelect Back Help UpdateService Contact Information NamePrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment Checking The Firing Rate High Altitude InstallationsTo Turn Off Gas Lighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation Sequence Of Operation Flow Chart YES noRough Starting, Rough Operation Operational ProblemsInstallation Errors Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure General MaintenanceMaintenance Schedule Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Temperature-Pressure Relief Valve Test Powered Anode RodsDrain Valve and Access Panels Vent SystemDiagrams CCB Central Control Board LayoutAHCG3 130T 300 Wiring Diagram User Interface ModulAHCG3 130T 400 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty