American Water Heater HCG3 130T 300 instruction manual Change Back Help

Page 46

Temperatures Menu (cont)

 

 

 

 

Description/Action

Display

 

Tank Temperature - non adjustable - control system

Top of Menu

 

 

sensed temperature (averaged from upper and lower

Temperatures

 

 

temperature probes).

Operating Set Point

 

140°F

Upper Temperature - non adjustable - control system

 

Differential

 

8°F

 

sensed temperature from the Upper Temperature Probe.

 

Lower Temperature - non adjustable - control system

Tank Temperature

 

120°F

Upper Temperature

 

122°F

 

sensed temperature from the Lower Temperature Probe.

 

(Heater Regulated to Tank) - non adjustable -

Lower Temperature

 

118°F

(Heater Regulated to Tank)

 

 

configuration information.

 

Upper Probe & Lower Probe Offset - adjustable user

Upper Probe Offset

 

0°F

 

setting, range -5° to +5° (factory setting 0°).

CHANGE

BACK

HELP

 

Note: These settings should only be used if the hot water

 

 

 

 

 

supply temperature varies greatly from the Operating Set

Bottom of Menu

 

 

Point setting.

 

 

The Upper and Lower Probe Offsets are used to calibrate

Temperatures

 

 

control system temperature sensing. This can improve the

Differential

 

8°F

 

precision of temperature control in the storage tank and at

 

 

Tank Temperature

 

120°F

 

points of use. This feature can also be used to compensate

 

 

Upper Temperature

 

122°F

 

for building recirculation loops (hot water returning to the

 

 

Lower Temperature

 

118°F

 

storage tank) that may cause the heating cycles to terminate

 

 

prematurely.

(Heater Regulated to Tank)

 

 

Example: If the current sensed temperature from a

Upper Probe Offset

 

0°F

 

Lower Probe Offset

 

0°F

 

temperature probe is 120°F (49°C) and the Offset setting for

 

 

that probe is adjusted to a value other than 0°, the control

CHANGE

BACK

HELP

 

system would calibrate or “offset” the sensed temperature

 

 

 

 

 

from the probe and the averaged tank temperature. Heating

 

 

 

 

cycles would be activated and deactivated based on the

 

 

 

 

calibrated (offset) temperature.

 

 

 

These settings are adjusted in the same way described for the Operating Set Point And Differential Adjustment on page 45.

Heater Status Menu

 

Description/Action

Display

 

Select Heater Status from the Main Menu and press the

Top of Menu

 

Operational Button under "SELECT" to enter this menu. This

Heater Status

 

menu contains non adjustable operational information. Use the

Status

Standby

Up & Down Buttons to navigate the menu.

Status - displays the current Operating State, see Table 12

ECO Contact

Closed

Low Gas PS

Closed

 

on page 44.

ECO Contact, Low Gas PS, Blocked Inlet PS, Blocked

Blocked Inlet PS

Closed

Blocked Outlet PS

Closed

 

Outlet PS, Blower Prover PS - displays the current state

 

of the switch contacts; open or closed.

Blower Prover PS

Open

Blower On, Igniter On, Gas Valve On - displays whether

Blower On

No

 

or not the control system is currently energizing these water

BACK

HELP

 

heater components; yes = energized, no = de-energized.

 

 

 

Igniter Current - displays whether or not the control

Bottom of Menu

 

 

system has detected the required minimum current, see

 

 

Sequence Of Operation on page 46.

Heater Status

 

Flame Detected - displays whether or not the control

Blower On

No

 

system has detected Main Burner flame during ignition from

 

Igniter On

No

 

the flame sensor.

External Input Enable - displays whether or not the S1

Igniter Current

No

Gas Valve On

No

 

dipswitches have been configured to activate the enable/

 

disable circuit, see Enable/Disable Circuit on page 39.

Flame Detected

No

Ignition Trials - displays whether or not the S1 dipswitches

External Input Enable

No

 

have been configured to allow 1 or 3 trials for ignition

Ignition Trials

3

 

before declaring an "Ignition Failure" Fault condition, see

BACK

HELP

 

the CCB - Central Control Board Layout on page 63.

 

 

 

46

Image 46
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional Precautions General Safety InformationHydrogen Gas Flammable Fire or Explosion Hazard Fire and Explosion HazardIntroduction Preparing For The InstallationQualified Installer or Service Agency Abbreviations UsedFeatures And Components Basic OperationTop View Top View ComponentsSide Views Recovery Capacities Installation ConsiderationsRough In Dimensions Gas Line Connection SizeClearance To Combustible Materials Service ClearanceLocating The Water Heater Intake Air and Vent Pipe ClearancesHard Water Extended Vent TerminationsOptional Concentric Terminations Circulation PumpsGas Pressure Requirements Installation RequirementsPower Supply Supply Gas LineClosed Water Systems Mixing ValvesDishwashing Machines Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsContaminated Air Condensate DrainCombustible Material Storage Condensate Drain Water TrapUnconfined Space Air RequirementsConfined Space Outdoor Air Through One Opening Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Vertical Termination Installation Intake AIR Screen Balance PlateVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationConcentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Vent Pipe is 4 Inch Schedule 40 PVCFour Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentInstallation Notes Water Heater InstallationCondensate Drain Installation Installation InstructionsSupply Gas Line Sizing U. S. Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing Metric UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Enable/Disable Circuit Electrical WiringPower Supply Connections Connecting An External Supervisory ControlValve Discharge Pipe Water Piping DiagramsWater Line Connections Thermometers not SuppliedHigh Temperature Applications Temperature RegulationHigh Temperature Limit Control ECO Thermostat ControlControl System Navigation Control System OperationOverview User Input Buttons Status Icons Icon DescriptionControl System Menus Operating StatesState Description Menu DescriptionBack Help User Settings & Control System MenusUpdate Cancel Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayECO Back AdvancedView Back Help YESSelect Back Help UpdateService Contact Information NamePrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment Checking The Firing Rate High Altitude InstallationsTo Turn Off Gas Lighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation Sequence Of Operation Flow Chart YES noRough Starting, Rough Operation Operational ProblemsInstallation Errors Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure General MaintenanceMaintenance Schedule Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Temperature-Pressure Relief Valve Test Powered Anode RodsDrain Valve and Access Panels Vent SystemDiagrams CCB Central Control Board LayoutAHCG3 130T 300 Wiring Diagram User Interface ModulAHCG3 130T 400 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty