American Water Heater HCG3 130T 300 Control System Operation, Overview, Control System Navigation

Page 42

Control System Operation

Overview

The water heaters covered in this manual are equipped with an electronic control system that regulates water temperature inside the storage tank. Heating cycles and ignition are managed by the control system. The ECO (energy cut out), flame sensor, pressure switches and temperature probes are monitored by the control system. The Combustion Blower, igniter, 24 VAC Gas Valve and anode rods are all powered by the control system.

The main components of the control system are a UIM (user interface module) and a CCB (central control board). The UIM is located on the top front side of the water heater. The CCB is mounted on top of the water heater inside a protective enclosure. See Features And Components on page 7 for location of these and all water heater components.

Control System Navigation

All operational information and user settings are displayed and accessed from the UIM. The UIM houses the control system's LCD (liquid crystal display) and five snap acting (momentary) user input buttons; an up, down and three (3) multi functional operational buttons below the LCD, see Figure 55.

User Input Buttons

The up and down buttons are used to navigate menus and adjust user settings.

The operational buttons are used to enter/exit menus, select menu items, activate adjustment modes and confirm or cancel new user settings. The operational buttons are

multifunctional, their current function is defined by the text that appears directly above each button on the LCD screen.

The Desktop Screen

During normal operation the control system will display the "Desktop" screen on the LCD which is the default screen. The control system will return to the Desktop screen when there are no active Fault or Alert conditions or when there has been no user input for several minutes.

Manufacturer and water heater model information is displayed in Title Bar at the top of the Desktop screen. Menu titles are displayed in the Title Bar when navigating the control system menus.

The first temperature shown on the Desktop screen, Tank Temperature, is the temperature of the water inside the water heater's storage tank.

The second temperature shown on the Desktop screen is the Operating Set Point. The Operating Set Point is the temperature at which the control system will maintain the water inside the storage tank.

Beneath the Operating Set Point is the "Status" line. The Status line shows the current operational state of the control system in real time, see Table 12 on page 44 for a description of the various operational states.

The Desktop screen also displays animated "Status Icons" to convey operational information, see Table 11 on page 43 for descriptions of the Status Icons.

UIM (user interface module)

LCD Screen

Information

Display

Status Icons

Desktop Screen Shown

MANUFACTURER / MODEL INFORMATION

Tank Temperature

103°F

Operating Set Point

120°F

Status: Heating

 

OFF

 

GAS

O

N

MENU

HELP

Title Bar

UP

DN

Up & Down buttons:

 

navigate menus,

 

adjust user settings

Operational buttons are multi functional. Their current function is defined by the text that appears directly above each button on the LCD screen.

3 Operational buttons: enter/exit menus, select menu items, activate adjustment modes, confirm/cancel changes.

Figure 55

42

Image 42
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ANSI/NSF-5Optional General Safety Information PrecautionsHydrogen Gas Flammable Fire or Explosion Hazard Fire and Explosion HazardIntroduction Preparing For The InstallationQualified Installer or Service Agency Abbreviations UsedFeatures And Components Basic OperationTop View Top View ComponentsSide Views Recovery Capacities Installation ConsiderationsRough In Dimensions Gas Line Connection SizeClearance To Combustible Materials Service ClearanceLocating The Water Heater Intake Air and Vent Pipe ClearancesHard Water Extended Vent TerminationsOptional Concentric Terminations Circulation PumpsGas Pressure Requirements Installation RequirementsPower Supply Supply Gas LineClosed Water Systems Mixing ValvesDishwashing Machines Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsContaminated Air Condensate DrainCombustible Material Storage Condensate Drain Water TrapAir Requirements Unconfined SpaceConfined Space Outdoor Air Through One Opening Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionVenting Installation General Venting InformationGeneral Venting Instructions Venting Requirements Venting Installation Sequence Power Vent InstallationDirect Vent Installation Vertical Termination Installation Intake AIR Screen Balance PlateVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationConcentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Vent Pipe is 4 Inch Schedule 40 PVCFour Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Eight Concentric TerminationsMultiple Concentric Termination Arrangements Two Concentric TerminationsEight Concentric Terminations Power Vent Horizontal Venting ArrangementsDirect Vent Horizontal Direct Vent Vertical Vent Horizontal Intake Direct Vent Horizontal Vent Vertical IntakeDirect Vent Horizontal Concentric Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentInstallation Notes Water Heater InstallationCondensate Drain Installation Installation InstructionsSupply Gas Line Sizing U. S. Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing Metric UnitsSupply Gas Regulator Installation Gas Line Leak TestingGas Line Connection Enable/Disable Circuit Electrical WiringPower Supply Connections Connecting An External Supervisory ControlValve Discharge Pipe Water Piping DiagramsWater Line Connections Thermometers not SuppliedHigh Temperature Applications Temperature RegulationHigh Temperature Limit Control ECO Thermostat ControlControl System Navigation Control System OperationOverview User Input ButtonsStatus Icons Icon DescriptionControl System Menus Operating StatesState Description Menu DescriptionBack Help User Settings & Control System MenusUpdate Cancel Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayECO Back AdvancedView Back Help YESSelect Back Help UpdateService Contact Information NameStart Up Prior to Start upInitial Start Up Supply Gas Pressure Adjustment Multiple Appliance InstallationsManifold Gas Pressure Adjustment High Altitude Installations Checking The Firing RateTo Turn Off Gas Lighting The Water Heater Lighting & Operation LabelHoneywell Troubleshooting Installation ChecklistSequence Of Operation Sequence Of Operation Flow Chart YES noRough Starting, Rough Operation Operational ProblemsInstallation Errors Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure General MaintenanceMaintenance Schedule Draining And FlushingFilling The Water Heater Sediment RemovalLime Scale Removal Temperature-Pressure Relief Valve Test Powered Anode RodsDrain Valve and Access Panels Vent SystemDiagrams CCB Central Control Board LayoutAHCG3 130T 300 Wiring Diagram User Interface ModulAHCG3 130T 400 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty