American Water Heater HCG3 130T 300 instruction manual Vertical Termination Direct Vent

Page 25

The intake air and vent terminations must be oriented facing downward and in the same direction as shown in Figure 21 on page 25.

The intake air and vent terminations must have a minimum separation of 24” (61 cm) measured on center line as shown in Figure 21 on page 25. In colder climates this separation should be increased to at least 48 inches (122 cm).

The bottom edge of the intake air and vent terminations must be a minimum of 12 inches (30 cm), 18 inches (45 cm) in Canada, above the average or expected snow level as shown in Figure 19 and Figure 21 on page 25.

6.When the intake air and/or vent piping from multiple water heaters will terminate in the same location the vent terminations can be grouped together in close proximity 0 inches/touching. Intake air terminations can also be grouped together in close proximity 0 inches/touching.

The distance between the closest vent and intake air terminations must be a minimum of 24 inches (61 cm) as shown in Figure 21. In colder climates this separation should be increased to at least 48 inches (122 cm).

7.Cut a 5 inch (13 cm) diameter hole for 4 inch pipe or 7 inch (18 cm) diameter hole for 6 inch pipe where the pipe(s) will pass through the roof.

Note: Beware of concealed wiring and piping when cutting through the roof.

8.Suspend the pipe(s) through center of hole using field supplied metal strapping or equivalent support materials as shown in Figure 19.

2” (5 cm)

 

 

 

MAXIMUM

 

 

FACTORY SUPPLIED

 

 

 

 

 

FIELD

 

 

 

 

STANDARD TERMINATION

 

 

 

 

POINTED DOWN TOWARDS

SUPPLIED

 

 

 

 

 

 

 

 

 

 

 

 

THE GROUND

90° ELBOW

 

 

 

 

 

 

 

 

 

FIELD SUPPLIED

PLUMBING

ROOF BOOT

OR FLASHING

between the field supplied 90° elbow and the factory supplied termination must not be excessive in length. The exposed portion of this pipe shall be no more than 2 inches (5 cm), see Figure 19.

IF LESS THAN

10 FEET (3 m)

24 INCHES (60 cm)

MINIMUM HEIGHT ABOVE

INTAKE AIR AND/OR VENT TERMINATION(S) MUST BE A MINIMUM OF 24 INCES (60 cm)

ABOVE ANY PARAPET, VERTICAL WALL OR STRUCTURE WITHIN 10 FEET (3 m) HORIZONTALLY.

VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE

INTAKE AIR AND/OR VENT (EXHAUST)

Figure 20

11.Return to Power Vent Installation on page 23 or Direct Vent Installation on page 23 to complete the installation of the intake air and/or vent piping between the termination(s) and the water heater.

24 INCHES (61 cm) MINIMUM

48 INCHES (122 cm) IN COLDER CLIMATES

MAINTAIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL.

FIELD

SUPPLIED 90° ELBOW

VENT (EXHAUST) TERMINATION

FACTORY SUPPLIED STANDARD TERMINATIONS POINTED DOWNWARD

INTAKE AIR

TERMINATION

MAINTAIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL.

FIELD

SUPPLIED

STRAP/SUPPORT

VERTICAL TERMINATION(S) INSTALLATION

INTAKE AIR AND/OR VENT (EXHAUST)

Figure 19

9.Slide a roof boot or equivalent flashing over the pipe and secure roof boot or equivalent flashing to roof (see Figure 19) and seal around the flashing.

10.Install the factory supplied intake air and/or vent termination(s) using field supplied pipe and one field supplied 90° elbow as shown in Figure 19. The short section of pipe that connects

FIELD SUPPLIED

PLUMBING

ROOF BOOTS

OR FLASHINGS

VERTICAL TERMINATION - DIRECT VENT

STANDARD TERMINATIONS

Figure 21

25

Image 25
Contents Commercial gas water heaters Table Of Contents ANSI/NSF-5 Safe Installation, Use and ServiceOptional Precautions General Safety InformationHydrogen Gas Flammable Fire and Explosion Hazard Fire or Explosion HazardQualified Installer or Service Agency Preparing For The InstallationIntroduction Abbreviations UsedBasic Operation Features And ComponentsTop View Components Top ViewSide Views Rough In Dimensions Installation ConsiderationsRecovery Capacities Gas Line Connection SizeLocating The Water Heater Service ClearanceClearance To Combustible Materials Intake Air and Vent Pipe ClearancesOptional Concentric Terminations Extended Vent TerminationsHard Water Circulation PumpsPower Supply Installation RequirementsGas Pressure Requirements Supply Gas LineDishwashing Machines Mixing ValvesClosed Water Systems Thermal ExpansionValve Discharge Pipe Requirements Temperature-Pressure Relief ValveCombustible Material Storage Condensate DrainContaminated Air Condensate Drain Water TrapUnconfined Space Air RequirementsConfined Space Outdoor Air Through Two Openings Fresh Air Openings For Confined SpacesOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Inspection Commonwealth of MassachusettsGeneral Venting Information Venting InstallationGeneral Venting Instructions Venting Requirements Power Vent Installation Venting Installation SequenceDirect Vent Installation Intake AIR Screen Balance Plate Vertical Termination InstallationVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationInch Concentric Termination Flat Roof Clearance Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationVent Pipe is 4 Inch Schedule 40 PVC Inch Concentric Termination Sidewall InstallationThree Concentric Terminations TWO Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsTwo Concentric Terminations Multiple Concentric Termination ArrangementsEight Concentric Terminations Venting Arrangements Power Vent HorizontalDirect Vent Horizontal Direct Vent Horizontal Vent Vertical Intake Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Concentric Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentCondensate Drain Installation Water Heater InstallationInstallation Notes Installation InstructionsGas Line Sizing Supply Gas Line InstallationSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsGas Line Leak Testing Supply Gas Regulator InstallationGas Line Connection Power Supply Connections Electrical WiringEnable/Disable Circuit Connecting An External Supervisory ControlWater Line Connections Water Piping DiagramsValve Discharge Pipe Thermometers not SuppliedHigh Temperature Limit Control ECO Temperature RegulationHigh Temperature Applications Thermostat ControlOverview Control System OperationControl System Navigation User Input ButtonsIcon Description Status IconsState Description Operating StatesControl System Menus Menu DescriptionUpdate Cancel User Settings & Control System MenusBack Help Description/Action DisplayChange Back Help Heater Information Description/Action Display Display Settings Description/ActionView Back Help Back AdvancedECO YESService Contact Information UpdateSelect Back Help NamePrior to Start up Start UpInitial Start Up Multiple Appliance Installations Supply Gas Pressure AdjustmentManifold Gas Pressure Adjustment Checking The Firing Rate High Altitude InstallationsTo Turn Off Gas Lighting & Operation Label Lighting The Water HeaterHoneywell Installation Checklist TroubleshootingSequence Of Operation YES no Sequence Of Operation Flow ChartInstallation Errors Operational ProblemsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Possible Causes Check/Repair Displayed Fault/Alert Message Fault And Alert MessagesBlower Prover Failure Maintenance Schedule MaintenanceGeneral Draining And FlushingSediment Removal Filling The Water HeaterLime Scale Removal Drain Valve and Access Panels Powered Anode RodsTemperature-Pressure Relief Valve Test Vent SystemCCB Central Control Board Layout DiagramsUser Interface Modul AHCG3 130T 300 Wiring DiagramUser AHCG3 130T 400 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty