American Water Heater HCG3 130T 300 instruction manual Display Settings Description/Action

Page 47

Display Settings

 

 

 

 

Description/Action

 

Display

 

Select Display Settings from the Main Menu and press the

 

Display Settings

 

Operational Button under "SELECT" to enter this menu. This

 

 

Temperature Units

°F

menu contains adjustable display options for viewing information

on the UIM’s LCD screen. Use the Up & Down Buttons to

Backlight Delay

30s

navigate the menu.

Contrast

 

60%

Temperature Units - Adjustable user setting that changes

 

 

 

 

 

temperature units display to Celsius °C or Fahrenheit °F.

 

 

 

Backlight Delay - Adjustable user setting that determines

 

 

 

 

how long the UIM’s LCD backlight remains illuminated after

 

 

 

 

a key has been pressed. Available settings are; Always Off,

CHANGE

BACK

HELP

 

10, 30 or 60 seconds and Always On.

Contrast - Adjustable user setting to adjust the UIM’s LCD screen contrast between text and background.

Note: These settings are adjusted in the same way described for the Operating Set Point And Differential Adjustment on page 45.

Heater Information

Description/Action

Display

Select Heater Information from the Main Menu and press the

Heater Information

Operational Button under "SELECT" to enter this menu. This

Elapsed Time

 

 

menu contains non adjustable operational information.

10 day 0 hrs 0 mins

Elapsed Time - Total accumulated time the control system

Burner On Time

 

(water heater) has been energized.

 

5 hrs 22 mins

Burner On Time - Total accumulated time the control

 

 

 

system has been in the heating operating state; burner run

Cycle Count

 

00000035

 

time.

CCB Version

 

X.XX

Cycle Count - Total accumulated count of heating cycles.

UIM Version

 

X.XX

CCB Version - Software version for central control board.

CHANGE

BACK

HELP

UIM Version - Software version for user interface module.

 

 

 

 

Note: Historical data is stored in the CCB's memory. If this

 

 

 

 

CCB is replaced during servicing the historical data on the

 

 

 

 

CCB being replaced will be lost. The data stored in the new

 

 

 

 

circuit board will no longer reflect the entire history of the

 

 

 

 

water heater.

 

 

 

 

The Elapsed Time, Burner On Time and Cycle Count indicate

 

 

 

 

age, usage and wear.

 

 

 

 

If the Cycle Count per day is high (divide cycle count by

 

 

 

 

days to determine cycles per day) or the cycle duration is

 

 

 

 

short (determine burner on time total minutes, divide burner

 

 

 

 

on time total minutes by cycle count) consider rasing the

 

 

 

 

Differential setting to avoid short cycling and excessive

 

 

 

 

component wear, see Operating Set Point And Differential

 

 

 

 

Adjustment on page 45.

 

 

 

 

This historical data can also be used to assist facilities

 

 

 

 

managers in forecasting planned replacement of equipment

 

 

 

 

to help avoid lengthy and costly hot water supply interruptions.

 

 

 

47

Image 47
Contents Commercial gas water heaters Table Of Contents Optional Safe Installation, Use and ServiceANSI/NSF-5 Hydrogen Gas Flammable General Safety InformationPrecautions Fire and Explosion Hazard Fire or Explosion HazardAbbreviations Used Preparing For The InstallationQualified Installer or Service Agency IntroductionBasic Operation Features And ComponentsTop View Components Top ViewSide Views Gas Line Connection Size Installation ConsiderationsRough In Dimensions Recovery CapacitiesIntake Air and Vent Pipe Clearances Service ClearanceLocating The Water Heater Clearance To Combustible MaterialsCirculation Pumps Extended Vent TerminationsOptional Concentric Terminations Hard WaterSupply Gas Line Installation RequirementsPower Supply Gas Pressure RequirementsThermal Expansion Mixing ValvesDishwashing Machines Closed Water SystemsValve Discharge Pipe Requirements Temperature-Pressure Relief ValveCondensate Drain Water Trap Condensate DrainCombustible Material Storage Contaminated AirConfined Space Air RequirementsUnconfined Space Outdoor Air Through Two Horizontal Ducts Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through One OpeningPage Inspection Commonwealth of MassachusettsGeneral Venting Instructions Venting InstallationGeneral Venting Information Venting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation Intake AIR Screen Balance Plate Vertical Termination InstallationVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationInch Concentric Termination Flat Roof Clearance Concentric Termination InstallationInch Concentric Termination KIT Inch Concentric Termination InstallationVent Pipe is 4 Inch Schedule 40 PVC Inch Concentric Termination Sidewall InstallationEight Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Four Concentric TerminationsEight Concentric Terminations Multiple Concentric Termination ArrangementsTwo Concentric Terminations Direct Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Power Vent Termination Clearances Sidewall Power VentDirect Vent Termination Clearances Sidewall Direct VentInstallation Instructions Water Heater InstallationCondensate Drain Installation Installation NotesSupply Gas Line Sizing Metric Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing U. S. UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Connecting An External Supervisory Control Electrical WiringPower Supply Connections Enable/Disable CircuitThermometers not Supplied Water Piping DiagramsWater Line Connections Valve Discharge PipeThermostat Control Temperature RegulationHigh Temperature Limit Control ECO High Temperature ApplicationsUser Input Buttons Control System OperationOverview Control System NavigationIcon Description Status IconsMenu Description Operating StatesState Description Control System MenusDescription/Action Display User Settings & Control System MenusUpdate Cancel Back HelpChange Back Help Heater Information Description/Action Display Display Settings Description/ActionYES Back AdvancedView Back Help ECOName UpdateService Contact Information Select Back HelpInitial Start Up Start UpPrior to Start up Manifold Gas Pressure Adjustment Supply Gas Pressure AdjustmentMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate Honeywell Lighting The Water HeaterLighting & Operation Label Sequence Of Operation TroubleshootingInstallation Checklist YES no Sequence Of Operation Flow ChartMomentary Ignition Operational ProblemsInstallation Errors Rough Starting, Rough OperationFault And Alert Conditions Possible Causes Check/Repair Displayed Fault/Alert Message Fault And Alert MessagesBlower Prover Failure Draining And Flushing MaintenanceMaintenance Schedule GeneralLime Scale Removal Filling The Water HeaterSediment Removal Vent System Powered Anode RodsDrain Valve and Access Panels Temperature-Pressure Relief Valve TestCCB Central Control Board Layout DiagramsUser Interface Modul AHCG3 130T 300 Wiring DiagramUser AHCG3 130T 400 Wiring DiagramCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty