American Water Heater HCG3 130T 300 instruction manual Sidewall Termination Installation

Page 26

Sidewall Termination Installation

1. Determine the location for the termination(s).

2. If installing only vent (exhaust) piping in a Power Vent

configuration through a sidewall; ensure that all exterior

sidewall clearance requirements for the termination, shown

in Figure 48 on page 34, are being maintained. These

clearances and those cited by local and national codes must

be maintained.

3. If installing both intake air and vent piping in a Direct Vent

configuration through a sidewall; ensure that all exterior

sidewall clearance requirements for the terminations, shown

in Figure 49 on page 35, for the vent and intake air termination

are being maintained. These clearances and those cited by

local and national codes must be maintained.

4. If installing both an intake air and vent termination in a

Direct Vent configuration through a sidewall there must

be a minimum of 24 inches (61 cm) separation, measured

on vertical center line, between the intake air and vent

terminations, see Figure 22.

Note: In colder climates this separation should be increased

to at least 48 inches (122 cm) between the intake air and

vent termination or any other appliance vent that discharges

moisture-laden air such as clothes dryers. This will reduce

possibility of frost over from side winds blowing exhaust

vapors to the intake air termination and is recommended for

Canadian installations.

5. If installing both intake air and vent terminations in a Direct

Vent configuration through a sidewall the intake air and

(18 cm) diameter hole for 6 inch pipe where the pipe(s) will pass through the wall.

Note: Beware of concealed wiring and piping when cutting through the wall.

8.Cut a length(s) of pipe being installed 3.5 inches (8.9 cm) to 9.5 inches (24.1 cm) longer than the wall thickness at the opening. See Figure 23.

Note: Vent Termination – exhaust gases of this water heater are less than 140°F. In cold climates water vapor in the exhaust gases will condense into a cloud of vapor where the vent exits the building. This vapor can gradually discolor exterior building surfaces. The vent termination should be located where this vapor cloud and potential discoloration are not a concern. Extending the exposed vent piping up to a maximum of 6 inches (15.2 cm) from the wall helps vapor from being trapped along a building’s face. To avoid this problem, the vent can also be terminated vertically through the roof, see Vertical Termination Installation on page 24.

9.Cement the intake air and/or vent termination to the section(s) of pipe cut to length in the above Step.

10.Slide the included metal wall plate(s) over the pipe(s) to stop against the intake air and/or vent termination. Place some silicone caulking (field supplied) on the back of the wall plate(s) to secure it to the wall.

11.Working from outside, slide the pipe and termination(s) assembled in the above steps through the wall. Ensure the termination(s) is pointed down towards the ground. See Figure 23.

vent terminations must be installed at the same elevation

measured on horizontal center line - see Figure 22.

VENT (EXHAUST)

INTAKE AIR

TERMINATION

TERMINATION

 

ELEVATION

 

INSTALL ON

 

CENTERLINE

 

KEEP INTAKE AND VENT

 

TERMINATION SCREENS

METAL PLATES INSTALL INSIDE AND/OR OUTSIDE

FROM

WATER

HEATER

COUPLING

INTERIOR WALL

INCREASE EXPOSED VENT PIPING UP TO A MAXIMUM OF 6 INCHES (15.2 cm) FROM WALL TO HELP PREVENT VAPOR FROM DISCOLORING THE WALL SURFACE IN COLDER CLIMATES

FACTORY SUPPLIED STANDARD TERMINATION POINTED DOWN TOWARDS THE GROUND

EXTERIOR WALL

CLEAR OF DEBRIS

24 INCHES (61 cm) MINIMUM

48 INCHES (122 cm) IN COLDER CLIMATES

SIDEWALL TERMINATION - DIRECT VENT

STANDARD TERMINATIONS

Figure 22

6.When the intake air and/or vent piping from multiple water heaters will terminate at the same location through a sidewall, the vent terminations can be grouped together in close proximity - 0 inches/touching. The intake air terminations can also be grouped together in close proximity - 0 inches/ touching.

However, the distance between the closest vent and intake air terminations must be a minimum of 24 inches (61 cm). In colder climates this separation should be increased to at least 48 inches (122 cm). See Figure 22.

7.Cut a 5 inch (13 cm) diameter hole for 4 inch pipe or 7 inch

SIDEWALL TERMINATION INSTALLATION

INTAKE AIR AND/OR VENT (EXHAUST)

Figure 23

12.Place a bead of silicone caulking (field supplied) around the gap between the installed pipe(s) and the wall. Apply enough to fill the gap between the pipe(s) and wall.

13.Press the wall plate flush against the outside wall.

14.Working from the inside apply enough silicone caulking on the back of the interior wall plate(s) to hold it in place and slide the wall plate over the installed pipe(s).

15.Install a coupling to the end of the pipe(s) inside the building. Before the silicone caulking has time to completely set go outside the building and ensure the termination(s) is still pointing down towards the ground. See Figure 23.

16.Return to Power Vent Installation on page 23 or Direct Vent Installation on page 23 to complete the installation of the intake air and/or vent piping between the termination(s) and the water heater.

26

Image 26
Contents Commercial gas water heaters Table Of Contents Optional Safe Installation, Use and ServiceANSI/NSF-5 Hydrogen Gas Flammable General Safety InformationPrecautions Fire or Explosion Hazard Fire and Explosion HazardIntroduction Preparing For The InstallationQualified Installer or Service Agency Abbreviations UsedFeatures And Components Basic OperationTop View Top View ComponentsSide Views Recovery Capacities Installation ConsiderationsRough In Dimensions Gas Line Connection SizeClearance To Combustible Materials Service ClearanceLocating The Water Heater Intake Air and Vent Pipe ClearancesHard Water Extended Vent TerminationsOptional Concentric Terminations Circulation PumpsGas Pressure Requirements Installation RequirementsPower Supply Supply Gas LineClosed Water Systems Mixing ValvesDishwashing Machines Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsContaminated Air Condensate DrainCombustible Material Storage Condensate Drain Water TrapConfined Space Air RequirementsUnconfined Space Outdoor Air Through One Opening Fresh Air Openings For Confined SpacesOutdoor Air Through Two Openings Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Instructions Venting InstallationGeneral Venting Information Venting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation Vertical Termination Installation Intake AIR Screen Balance PlateVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationConcentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Vent Pipe is 4 Inch Schedule 40 PVCFour Concentric Terminations TWO Concentric TerminationsThree Concentric Terminations Eight Concentric TerminationsEight Concentric Terminations Multiple Concentric Termination ArrangementsTwo Concentric Terminations Direct Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentInstallation Notes Water Heater InstallationCondensate Drain Installation Installation InstructionsSupply Gas Line Sizing U. S. Units Supply Gas Line InstallationGas Line Sizing Supply Gas Line Sizing Metric UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Enable/Disable Circuit Electrical WiringPower Supply Connections Connecting An External Supervisory ControlValve Discharge Pipe Water Piping DiagramsWater Line Connections Thermometers not SuppliedHigh Temperature Applications Temperature RegulationHigh Temperature Limit Control ECO Thermostat ControlControl System Navigation Control System OperationOverview User Input ButtonsStatus Icons Icon DescriptionControl System Menus Operating StatesState Description Menu DescriptionBack Help User Settings & Control System MenusUpdate Cancel Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayECO Back AdvancedView Back Help YESSelect Back Help UpdateService Contact Information NameInitial Start Up Start UpPrior to Start up Manifold Gas Pressure Adjustment Supply Gas Pressure AdjustmentMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate Honeywell Lighting The Water HeaterLighting & Operation Label Sequence Of Operation TroubleshootingInstallation Checklist Sequence Of Operation Flow Chart YES noRough Starting, Rough Operation Operational ProblemsInstallation Errors Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure General MaintenanceMaintenance Schedule Draining And FlushingLime Scale Removal Filling The Water HeaterSediment Removal Temperature-Pressure Relief Valve Test Powered Anode RodsDrain Valve and Access Panels Vent SystemDiagrams CCB Central Control Board LayoutAHCG3 130T 300 Wiring Diagram User Interface ModulAHCG3 130T 400 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty