American Water Heater HCG3 130T 300 Operating States, State Description, Control System Menus

Page 44

Operating States

The current operational state of the water heater is displayed on the Desktop screen as the "Status." The common operational states are described in the table below. See Figure 55 on page 42 and the Sequence Of Operation on page 44.

Table 12

State

Description

Standby

The water heater is not in an active heating cycle. IE: the Tank Temperature is at or above the Operating Set Point.

Input Verification

The control system is conducting a diagnostic check at the beginning of a heating cycle.

Short Cycle Delay

The control system is waiting for a pre-defined time period to expire before initiating a heating cycle. This prevents "short-

 

cycling" which can greatly accelerate wear on components such as the Hot Surface Igniter and Combustion Blower.

 

Note: If the control system is in this operational state increase the Differential setting in the Temperatures menu to lengthen

 

heating cycles.

Pre-Purge

The Combustion Blower is energized to flush residual flue gases from the combustion chamber prior to ignition.

Igniter Warm Up

The Hot Surface Igniter is energized and is currently warming up to ensure proper ignition.

 

See the Sequence Of Operation on page 44 for minimum current (AC amps) information.

Ignition Activation

The 24 VAC Gas Valve is energized and opens to allow fuel gas to flow to the Main Burner.

Ignition Verification

The control system is monitoring the flame sensor for the required minimum flame sensing current.

 

See the Sequence Of Operation on page 44 for minimum flame sensing current (DC micro amps) information.

Inter-Purge

The Combustion Blower is energized to flush residual fuel gas from the combustion chamber after a failed ignition attempt.

Heating

Ignition was successful, flame sensing current has been established. The water in the storage tank is being heated.

Post-Purge

The Combustion Blower is energized to flush residual flue gases from the combustion chamber at the end of a heating cycle.

Fault

The control system has detected a Fault condition. Heating operation is disabled until the Fault condition is corrected. Power

 

to the water heater must be cycled off and on to reset the control system.

 

Note: Cycling power will not reset the control system if the condition that caused the Fault has not been corrected.

Control System Menus

From the Desktop screen pressing the Operational directly below "Menu" on the LCD will display the "Main Menu" this is where all control system menus are located. The table below describes the control system menus.

Table 13

Menu

Description

Temperatures

Most commonly accessed menu. Contains the Operating Set Point and Differential user settings.

Heater Status

This menus displays the current state of all pressure switches and the ECO (open/closed). The on/off status of the

 

Combustion Blower, gas valve, igniter, flame sensor and other monitored water heater components are displayed in

 

this menu.

Display Settings

Temperature units (°F or °C), the LCD appearance (brightness/contrast) and backlight delay user adjustable settings

 

are located in this menu.

Heater Information

Elapsed time of operation, total heating cycle time, heating cycle count, heating on time along with UIM and CCB

 

software revisions can be viewed in this menu.

Current Fault

Displays any current Alert or Fault messages.

Fault History

This control system menu retains a list of the last nine (9) Fault and Alert messages with a time stamp. The newest

 

event will replace the oldest.

Fault Occurrence

This control system menu retains a running total of how many times each Fault condition has occurred since the water

 

heater was first installed.

Restore Factory Defaults

This control system feature allows the user to restore control system user settings to their factory default settings.

 

Display Settings preferences ARE NOT changed when factory defaults are restored.

Help Screens

Text based operational and user information explaining how to change user settings, navigate the control system menus

 

and icon descriptions.

44

Image 44
Contents Commercial gas water heaters Table Of Contents Optional Safe Installation, Use and ServiceANSI/NSF-5 Hydrogen Gas Flammable General Safety InformationPrecautions Fire or Explosion Hazard Fire and Explosion HazardPreparing For The Installation Qualified Installer or Service AgencyIntroduction Abbreviations UsedFeatures And Components Basic OperationTop View Top View ComponentsSide Views Installation Considerations Rough In DimensionsRecovery Capacities Gas Line Connection SizeService Clearance Locating The Water HeaterClearance To Combustible Materials Intake Air and Vent Pipe ClearancesExtended Vent Terminations Optional Concentric TerminationsHard Water Circulation PumpsInstallation Requirements Power SupplyGas Pressure Requirements Supply Gas LineMixing Valves Dishwashing MachinesClosed Water Systems Thermal ExpansionTemperature-Pressure Relief Valve Valve Discharge Pipe RequirementsCondensate Drain Combustible Material StorageContaminated Air Condensate Drain Water TrapConfined Space Air RequirementsUnconfined Space Fresh Air Openings For Confined Spaces Outdoor Air Through Two OpeningsOutdoor Air Through One Opening Outdoor Air Through Two Horizontal DuctsPage Commonwealth of Massachusetts InspectionGeneral Venting Instructions Venting InstallationGeneral Venting Information Venting Requirements Direct Vent Installation Venting Installation SequencePower Vent Installation Vertical Termination Installation Intake AIR Screen Balance PlateVertical Termination Direct Vent Sidewall Termination Installation Sidewall Termination InstallationConcentric Termination Installation Inch Concentric Termination Flat Roof ClearanceInch Concentric Termination Installation Inch Concentric Termination KITInch Concentric Termination Sidewall Installation Vent Pipe is 4 Inch Schedule 40 PVCTWO Concentric Terminations Three Concentric TerminationsFour Concentric Terminations Eight Concentric TerminationsEight Concentric Terminations Multiple Concentric Termination ArrangementsTwo Concentric Terminations Direct Vent Horizontal Power Vent HorizontalVenting Arrangements Direct Vent Horizontal Concentric Direct Vent Vertical Vent Horizontal IntakeDirect Vent Horizontal Vent Vertical Intake Termination Clearances Sidewall Power Vent Power VentTermination Clearances Sidewall Direct Vent Direct VentWater Heater Installation Condensate Drain InstallationInstallation Notes Installation InstructionsSupply Gas Line Installation Gas Line SizingSupply Gas Line Sizing U. S. Units Supply Gas Line Sizing Metric UnitsGas Line Connection Supply Gas Regulator InstallationGas Line Leak Testing Electrical Wiring Power Supply ConnectionsEnable/Disable Circuit Connecting An External Supervisory ControlWater Piping Diagrams Water Line ConnectionsValve Discharge Pipe Thermometers not Supplied Temperature Regulation High Temperature Limit Control ECO High Temperature Applications Thermostat ControlControl System Operation OverviewControl System Navigation User Input ButtonsStatus Icons Icon DescriptionOperating States State DescriptionControl System Menus Menu DescriptionUser Settings & Control System Menus Update CancelBack Help Description/Action DisplayChange Back Help Display Settings Description/Action Heater Information Description/Action DisplayBack Advanced View Back HelpECO YESUpdate Service Contact InformationSelect Back Help NameInitial Start Up Start UpPrior to Start up Manifold Gas Pressure Adjustment Supply Gas Pressure AdjustmentMultiple Appliance Installations To Turn Off Gas High Altitude InstallationsChecking The Firing Rate Honeywell Lighting The Water HeaterLighting & Operation Label Sequence Of Operation TroubleshootingInstallation Checklist Sequence Of Operation Flow Chart YES noOperational Problems Installation ErrorsRough Starting, Rough Operation Momentary IgnitionFault And Alert Conditions Fault And Alert Messages Possible Causes Check/Repair Displayed Fault/Alert MessageBlower Prover Failure Maintenance Maintenance ScheduleGeneral Draining And FlushingLime Scale Removal Filling The Water HeaterSediment Removal Powered Anode Rods Drain Valve and Access PanelsTemperature-Pressure Relief Valve Test Vent SystemDiagrams CCB Central Control Board LayoutAHCG3 130T 300 Wiring Diagram User Interface ModulAHCG3 130T 400 Wiring Diagram UserCirculation Pump Wiring Diagrams Water Piping Diagrams Temperature & Pressure Tank Temperature ALT. Cold Water American Storage Tank Water Piping Diagrams Line Temperature Control HOT Water Outlet Pipe T&P to Open Drain Finished Floor Limited Warranty