Contents
Models CHS-810, CHS-814, CHS-819, and CHS-824
CHS Tangential Feed Granulators
Date Manual Number UGG011/0504 Serial Numbers Model Numbers
Technical Specification
Table of Contents
4. Safety Instructions
Installation
Spare Parts List
Service
Wiring Diagram
i i l Ta b l e o f C o n t e n t s
A. Customer Service
11. Accessories, Overview
10. Layout
12. Transport and Storage
i v l Ta b l e o f C o n t e n t s
P u r p o s e o f t h e U s e r G u i d e . . . . . . . . . . . . . 1
I n t r o d u c t i o n
H o w t h e G u i d e i s O r g a n i z e d . . . . . . . . . . . . 1
AT T E N T I O N
How the Guide is Organized
Purpose of the User Guide
Your Responsibility as a User
WARNING Voltage hazard
AT T E N T I O N Read This so no One Gets Hurt
1 I n t r o d u c t i o n
This manual applies to the CHS series of Conair granulators
Technical Specifications
Technical Specifications
Technical Specifications l 2
2 - 2 l Technical Specifications
Hardened cutter housing
Performance characteristics
SPECIFICATION NOTES
G e n e r a l
Function Description
S a f e t y S y s t e m
Function Description
General
Function Description
models with a conveyor, the hopper is equipped with a conveyor belt. The conveyor can be equipped with a metal detector
Safety Switch
Safety System
Emergency Stop
Before Starting
Star Knob
3 - 6 l Function Description
4 S a f e t y I n s t r u c t i o n s
Safety Instructions
S a f e t y I n s t r u c t i o n s l 4
Electrical installation must only be done by a competent electrician
Safety Instructions
During maintenance, pull out the plug on the distribution box
If the rotor must be turned manually - do this with great care
DANGER! Cutting or pinch risk
DANGER! High voltage
DANGER! Be careful
4 - 4 l S a f e t y I n s t r u c t i o n s
I n s t a l l a t i o n l 5
I n s t a l l a t i o n
Pre-Start Checks
I n s t a l l a t i o n
Two Hours After First Start
The granulator should be connected by a competent electrician
Electrical Connection
Check the direction of rotation of the granulator motor
If any direction of rotation should be incorrect
Opening the hopper
Opening of Hopper, Screen Box and Granule Bin
Opening the screen box
screen box, switch both the main switch and
Closing the Screen Box, Granule Bin and Hopper
Close the screen box and install the granule bin
Close the hopper
There is a pinch risk during closing, be careful
5 - 6 l M a i n t e n a n c e
Maintenance
Operation and Daily Maintenance
Operation and Daily Maintenance l 6
S t a r t i n g a n d S t o p i n g
Starting and Stopping
Operation and Daily Maintenance
6 - 2 l Operation and Daily Maintenance
Daily Inspection
Inspection
Weekly Inspection
Monthly Inspection
Switch “Off” both the main switch and the switch on the granulator
Cleaning
6 - 4 l Operation and Daily Maintenance
Re-install after cleaning
6 - 6 l Operation and Daily Maintenance
Fault-Finding
The granulator does not start
Operation and Daily Maintenance l 6
6 - 8 l Operation and daily maintenance
S e r v i c e
Changing the knives
Service
Removing the knives
Changing the knives
First install the rear, fixed knife
Installing the Knives
Install the rotating knives
6 Install screws A with washers B, and tighten so that they hold
Then install the front, fixed knife
Sharpening Knives - Granulators with Open Cutter
Sharpening Knives
Grind the cutting angle of the knives to
Transmission
V-Belts, Inspection, and Adjustment
The granulator is driven by 3 V-belts Checking the V-belts
V-belt Adjustment
Transmission continued
Cutter Housing
Lubrication
7 - 1 0 l Service
Cutter Pulley/Motor Pulley
Installing
Removal
Cutter Pulley
7 - 1 2 l Service
S a f e t y
Spare Parts List
Ordering Spare Parts
Spare Parts List
Art. no
Cutting Chamber
Description
Art. no
Staggered Rotor
Description
8 - 4 l S p a r e P a r t s L i s t
List
Open Rotor
Spare
Parts
Knives
Knives, Open Cutter
8 - 6 l S p a r e P a r t s L i s t
Art. no
Screen Box
Screen
8 - 8 l S p a r e P a r t s L i s t
Granule Bin Manual Optional
8 - 1 0 l S p a r e P a r t s L i s t
Vaccum Suction /Blower F-7/F-15
Pos Qty
Art. no
Hopper
8 - 12 l S p a r e P a r t s L i s t
Hopper - Noise encapsulated machine with with Conveyor
S p a r e P a r t s L i s t l 8 - 1
Hopper Device
8 - 14 l S p a r e P a r t s L i s t
Sound Cabin
8.17 Enclosure/Body
8 - 1 6 l S p a r e P a r t s L i s t
Safety
9 Wiring Diagram
Wiring Diagram
W i r i n g D i a g r a m
W i r i n g D i a g r a m l 9
Wiring diagram
Relay functions and normal settings
Current Sensing Relay
Default setting for this granulator
Connection
Relay Setting
Example
9 - 6 l W i r i n g D i a g r a m
1 0 Layout
L a y o u t
1 0 - 2 l L a y o u t
Layout
1650mm64.96in
1490mm58.66in
27.56in.700mm
1790mm70.47in
1 0 - 4 l L a y o u t
1 1 Accessories
A c c e s s o r i e s
Ordering Spare Parts
A c c e s s o r i e s
Setting Up the Knives
Pre - Setting of Rotating Knives, Granulator with Open Cutter
Installation of Pre-Set Knives
Tighten the fastening screws, tightening torque 162.26lb-ft 220 Nm
Third Fixed Knife
Installation
Sharpening
Band Conveyor
Safety
Electrical Connection
The band conveyor should be connected up by an authorised electrician
Trouble-shooting
Maintenance
Starting
If the belt moves obliquely
11 - 8 l A c c e s s o r i e s
Spare Parts for the Band Conveyor
U n p a c k i n g a n d C h e c k i n g
Transport and Storage
Transport and
Storeage
Lifting and Transport to Place of Use
Transport and storage
Unpacking and Checking
Positioning in Place of Use
Long-Term Storage/Conservation
Storage
1 2 - 4 l T r a n s p o r t a n d S t o r a g e
We’re Here to Help
How to Contact Customer Ser vice
Before You Call
From outside the United States, call
Performance Warranty
Equipment Guarantee
Warranty Limitations
A - 2 l A p p e n d i