Conair CHS-810 manual I n s t a l l a t i o n l 5

Page 23
I n s t a l l a t i o n

S E C T I O N

5

I n s t a l l a t i o n

Pre-start checks

5-2

Two hours after first start

5-2

Electrical connection

5-3

Opening of hopper, screen box and granule bin

5-4

Closing the screen box, granule bin and hopper

5-5

Installation

5

 

 

I n s t a l l a t i o n l 5 - 1

Image 23
Contents Models CHS-810, CHS-814, CHS-819, and CHS-824 CHS Tangential Feed GranulatorsDate Manual Number UGG011/0504 Serial Numbers Model Numbers Installation Table of ContentsTechnical Specification 4. Safety Instructionsi i l Ta b l e o f C o n t e n t s ServiceSpare Parts List Wiring Diagram12. Transport and Storage 11. Accessories, OverviewA. Customer Service 10. Layouti v l Ta b l e o f C o n t e n t s AT T E N T I O N I n t r o d u c t i o nP u r p o s e o f t h e U s e r G u i d e . . . . . . . . . . . . . 1 H o w t h e G u i d e i s O r g a n i z e d . . . . . . . . . . . . 1Your Responsibility as a User Purpose of the User GuideHow the Guide is Organized 1 I n t r o d u c t i o n AT T E N T I O N Read This so no One Gets HurtWARNING Voltage hazard This manual applies to the CHS series of Conair granulators Technical Specifications l 2 Technical SpecificationsTechnical Specifications SPECIFICATION NOTES Hardened cutter housing2 - 2 l Technical Specifications Performance characteristicsFunction Description Function DescriptionG e n e r a l S a f e t y S y s t e mGeneral Function Descriptionmodels with a conveyor, the hopper is equipped with a conveyor belt. The conveyor can be equipped with a metal detector Emergency Stop Safety SystemSafety Switch Before Starting Star Knob3 - 6 l Function Description S a f e t y I n s t r u c t i o n s l 4 Safety Instructions4 S a f e t y I n s t r u c t i o n s If the rotor must be turned manually - do this with great care Safety InstructionsElectrical installation must only be done by a competent electrician During maintenance, pull out the plug on the distribution boxDANGER! Be careful DANGER! High voltageDANGER! Cutting or pinch risk 4 - 4 l S a f e t y I n s t r u c t i o n s I n s t a l l a t i o n l 5 I n s t a l l a t i o nTwo Hours After First Start I n s t a l l a t i o nPre-Start Checks If any direction of rotation should be incorrect Electrical ConnectionThe granulator should be connected by a competent electrician Check the direction of rotation of the granulator motorscreen box, switch both the main switch and Opening of Hopper, Screen Box and Granule BinOpening the hopper Opening the screen boxThere is a pinch risk during closing, be careful Close the screen box and install the granule binClosing the Screen Box, Granule Bin and Hopper Close the hopper5 - 6 l M a i n t e n a n c e S t a r t i n g a n d S t o p i n g Operation and Daily MaintenanceMaintenance Operation and Daily Maintenance l 66 - 2 l Operation and Daily Maintenance Operation and Daily MaintenanceStarting and Stopping Monthly Inspection InspectionDaily Inspection Weekly Inspection6 - 4 l Operation and Daily Maintenance CleaningSwitch “Off” both the main switch and the switch on the granulator Re-install after cleaning The granulator does not start Fault-Finding6 - 6 l Operation and Daily Maintenance Operation and Daily Maintenance l 6 6 - 8 l Operation and daily maintenance S e r v i c e Changing the knives ServiceChanging the knives Removing the knivesInstall the rotating knives Installing the KnivesFirst install the rear, fixed knife 6 Install screws A with washers B, and tighten so that they hold Then install the front, fixed knife Sharpening Knives - Granulators with Open Cutter Sharpening KnivesGrind the cutting angle of the knives to The granulator is driven by 3 V-belts Checking the V-belts V-Belts, Inspection, and AdjustmentTransmission V-belt Adjustment Transmission continued7 - 1 0 l Service LubricationCutter Housing Cutter Pulley InstallingCutter Pulley/Motor Pulley Removal7 - 1 2 l Service S a f e t y Spare Parts ListOrdering Spare Parts Spare Parts ListDescription Cutting ChamberArt. no 8 - 4 l S p a r e P a r t s L i s t Staggered RotorArt. no DescriptionParts Open RotorList Spare8 - 6 l S p a r e P a r t s L i s t Knives, Open CutterKnives Spare Parts 8 - 8 l S p a r e P a r t s L i s t ScreenScreen Box Granule Bin Manual Optional Art. no Vaccum Suction /Blower F-7/F-158 - 1 0 l S p a r e P a r t s L i s t Pos QtyHopper 8 - 12 l S p a r e P a r t s L i s t Hopper - Noise encapsulated machine with with ConveyorS p a r e P a r t s L i s t l 8 - 1 Hopper Device8 - 14 l S p a r e P a r t s L i s t Sound Cabin8.17 Enclosure/Body 8 - 1 6 l S p a r e P a r t s L i s t SafetyW i r i n g D i a g r a m l 9 Wiring Diagram9 Wiring Diagram W i r i n g D i a g r a mWiring diagram Relay functions and normal settings Current Sensing RelayDefault setting for this granulator ConnectionRelay Setting Example9 - 6 l W i r i n g D i a g r a m 1 0 Layout L a y o u t1 0 - 2 l L a y o u t Layout1790mm70.47in 1490mm58.66in1650mm64.96in 27.56in.700mm1 0 - 4 l L a y o u t 1 1 Accessories A c c e s s o r i e sOrdering Spare Parts A c c e s s o r i e sInstallation of Pre-Set Knives Pre - Setting of Rotating Knives, Granulator with Open CutterSetting Up the Knives Tighten the fastening screws, tightening torque 162.26lb-ft 220 Nm Sharpening InstallationThird Fixed Knife The band conveyor should be connected up by an authorised electrician SafetyBand Conveyor Electrical ConnectionIf the belt moves obliquely MaintenanceTrouble-shooting Starting11 - 8 l A c c e s s o r i e s Spare Parts for the Band ConveyorStoreage Transport and StorageU n p a c k i n g a n d C h e c k i n g Transport andPositioning in Place of Use Transport and storageLifting and Transport to Place of Use Unpacking and CheckingLong-Term Storage/Conservation Storage1 2 - 4 l T r a n s p o r t a n d S t o r a g e From outside the United States, call How to Contact Customer Ser viceWe’re Here to Help Before You CallA - 2 l A p p e n d i Equipment GuaranteePerformance Warranty Warranty Limitations