Hoshizaki KM-650MWH, KM-650MAH, KM-650MRH Cycle Steps Harvest Cycle Freeze Cycle One Minute

Page 14

KM-650MAH, KM-650MWH, KM-650MRH Sequence Flow Chart and Component Operation

14

Cycle Steps

 

 

 

 

 

 

 

2. Harvest Cycle

 

 

 

3. Freeze Cycle

 

 

 

 

 

 

 

 

1. One Minute

 

• Maximum inlet water valve time: 6 minutes

 

• Minimum freeze time: 5 minutes

4. Pump-Out

 

 

 

 

 

 

 

Fill Cycle

 

• Maximum harvest time: 20 minutes

 

• Maximum freeze time: freeze timer setting

 

Cycle

 

 

Thermistor in

1 to 3 minute timer

5 minute timer

F/S in

 

Initial startup always

 

control

in control

in control

control

 

 

 

 

 

 

 

begins here

 

F/S closed

 

F/S closed

 

 

"E" board will have

F/S Check

F/S Check

 

 

 

 

 

 

 

 

 

 

 

 

5 second delay

WV Energized

Comp energized

Thermistor temp

Comp continues

Freeze cycle

Pump motor stops

 

F/S open

HGV energized

reaches 48°F (9°C)

FMR continues

operation turned

for 2 sec. and then

 

FMR energized

(3.9 kor less)

HGV de-energized

over to F/S

reverses for 10/20 sec.

 

 

WV continues

Harvest timer starts

WV de-energized

 

each 1, 2, 5, or 10 cycles.

 

 

 

 

PM energized

 

Comp continues

 

 

 

F/S open

FMS energized

 

FMR continues

 

 

 

If F/S is open, compressor stops and cycle returns to 1 minute fill

HGV energized

 

 

 

FMS de-energized

 

 

 

 

 

 

Legend:

Comp - compressor FMR - remote fan motor FMS - self-contained fan motor F/S - float switch

HGV - hot gas valve PM - pump motor WV - inlet water valve

Components Energized when the Control Switch is in the WASH Position

The WASH position on the control switch is used when cleaning and sanitizing the unit. When in the WASH position, power is supplied to the pump motor. With the cleaning valve closed, the cleaner and sanitizer flow over the outside of the evaporator plate assembly. With the cleaning valve open, the cleaner and sanitizer flow over both the outside and the inside of the evaporator plate assembly.

Note: Close the cleaning valve after cleaning and sanitizing are complete, otherwise the unit will not re-start when the control switch is placed in the ICE position.

Image 14
Contents KM-650MAH KM-650MWH KM-650MRH Hoshizaki AMERICA, INC Contents Page Specifications Icemaker KM-650MAH air-cooledKM-650MWH water-cooled Water Cooled CondenserKM-650MRH remote air-cooled Condensing Unit URC-5FSpecifications Model URC-5FII. General Information Construction KM-650MWH water-cooled KM-650MRH remote air-cooled Sequence of Operation Cycle Steps Harvest Cycle Freeze Cycle One Minute Control Board Control Board Control Products E Control BoardControl Board Layout Features Maximum Water Supply Period 6 minutesLED Lights and Audible Alarm Safeties Controls and Adjustments Default Dip Switch SettingsHarvest Timer dip switch 1 Pump-Out Frequency Control dip switch 5 Control Board Check Procedure Control Board ReplacementKM-650MAH air-cooled KM-650MWH water-cooled KM-650MRH remote air-cooled Wiring Diagrams KM-650MAH air-cooled and KM-650MWH water-cooledPsig Performance Data 108680 615 IV. Service Diagnosis Minute KM Diagnostic Procedure Diagnostic Charts No Ice ProductionProblem Possible Cause Remedy Problem Possible Cause Remedy Problem Possible Cause Remedy Evaporator is Frozen Up Other Low Ice ProductionAbnormal Ice Problem Possible Cause Remedy Refrigerant Recovery Removal and Replacement of ComponentsService for Refrigerant Lines Evacuation and Recharge R-404ARemoval and Replacement of Compressor BrazingRemoval and Replacement of Drier Removal and Replacement of Expansion Valve Removal and Replacement of Hot Gas Valve and Line Valve Removal and Replacement of Evaporator Adjustment of Water Regulating Valve Water-Cooled Model Only Page Removal and Replacement of Thermistor Removal and Replacement of Fan MotorRemoval and Replacement of Inlet Water Valve Removal and Replacement of Pump MotorRemoval and Replacement of Spray Tubes VI. Cleaning and Maintenance Instructions Cleaning and Sanitizing ProceduresCleaning Procedure Stainless Steel Exterior MaintenanceSanitizing Procedure Following Cleaning Procedure Air Filters air-cooled models only Preparing the Icemaker for Long StorageStorage Bin and Scoop Condenser air-cooled and remote air-cooled models onlyDrain the potable water supply line Drain the potable water tank
Related manuals
Manual 32 pages 59.37 Kb