GE Monogram Built-In Dishwashers Installation Preparation, Parts Supplied, Tools YOU will Need

Page 3

Installation Preparation

PARTS SUPPLIED:

Two #8-18 x 5/8" Phillips special-head screws, to secure dishwasher to underside of countertop or sides of cabinets.

Junction box cover and #10-1/2" hex head screw

Side and top trim

Sound upgrade kit (some models)

Drain hose (78"), drain hose hanger and hose clamp

Literature, Product Samples and/or coupons

Hard water test strip (Models with Bulk Dispenser)

 

 

 

Side Trim

 

 

 

Side Trim

#8 Phillips Special-Head

#10 Hex Head

 

Top Trim

Screws 5/8" Long

J-Box Screw

Trim Pieces

 

1/2" Long

 

 

 

 

Drain Hose (78")

Sound Upgrade

 

Junction Box Cover

 

 

Kit (Some Models)

 

 

Drain Hose Hanger

Hard Water Test Strip

 

(Models with Bulk Dispenser)

Hose Clamp

MATERIALS YOU WILL NEED:

Ferrule, compression nut and 90° Elbow (3/8" NPT external thread on one end, opposite end sized to fit water supply)

Thread seal tape

UL-Listed wire nuts (3)

 

Hand

Thread

Wire Nuts (3)

 

 

 

Seal Tape

 

90° Elbow, Ferrule and

Shut-Off

 

 

 

Valve

 

 

Compression Nut

 

 

 

 

 

Materials For New Installations Only:

Air gap for drain hose, if required

Waste tee for house plumbing, if applicable

Electrical cable or power cord, if applicable

Screw-type hose clamps

Strain relief for electrical connection

Hand shut-off valve

Water line 3/8" min. copper

Coupler for extending drain line, if applicable

GPF10L 10' drain hose, if needed

Hot Water Line

GPF10L

Electrical Cable

(or Power Cord, if applicable)

10' Drain Hose

 

Waste Tee

Coupler

Screw-Type

 

Air Gap

Hose Clamps

Strain Relief

 

 

 

TOOLS YOU WILL NEED:

Phillips-head screwdriver

Phillips-Head

 

1/4" and 5/16"

• 5/16" and 1/4" nutdriver

Screwdriver

 

• 6" Adjustable wrench

 

 

Nutdriver

• Level

 

 

6" Adjustable

• Carpenter's square

 

 

• Measuring tape

 

 

Wrench

• Safety glasses

 

 

 

• Flashlight

 

15/16" Socket

Tubing Cutter

• Bucket to catch water when flushing the line

 

 

 

• 15/16" socket (optional for skid removal)

 

 

 

• Gloves

 

 

Measuring Tape

 

 

 

For New Installations Only:

Flashlight

 

• Tubing cutter

 

 

• Drill and appropriate bits

 

 

• Hole saw set

 

Drill and Bits

 

Safety Glasses

 

Hole Saw Set

Level

Carpenter's

Square

Gloves

Bucket

3

Image 3
Contents 31-30246 Installation InstructionsSafety Information ContentsRead Carefully Keep These Instructions Tools YOU will Need Installation PreparationParts Supplied Materials YOU will NeedPrepare Dishwasher Enclosure Advance PlanningBeen removed. Dishwasher will Connecting drain line to disposerPrepare Drain Plumbing Check to be sure that drain plug hasGrounding Instructions-Permanent Connection Prepare Electrical WiringGrounding Instructions-Power Cord Models Cabinet Preparation and Wire RoutingPrepare HOT Water Supply Installation InstructionsLocate Installation Items Install Trim PiecesRemove Toekick Brace Remove Wood BASE, Install Leveling LegsCheck Door Balance Remove ToekickTip for quiet drain pump operation Install Power CordPosition Water Line Housing Wiring Install 90 ElbowSlide Dishwasher Into Final Position Slide Dishwasher Three Fourths WAY Into CabinetInsert Drain Hose Through Cabinet Special Considerations for Positioning Level DishwasherConnect Water Supply Check to be sure that drain plug Drain Line InstallationConnect Drain Line Insert the drain hose into the air gap as shownConnect Power Supply Pretest Check ListSee Steps 9 SET Water Hardness Installation Instructions/Custom Panel DimensionsInstall Sound Upgrade KIT if Equipped Dishwasher WET TestPub. No Part No C1559P184 Install ToekickLiterature Locate toekick and screws set aside in stepInstructions d’installation Contenu Durée d’installation 1 à 3 heuresInformation de sécurité Lire Attentivement IL Faut Garder CES InstructionsMatériaux Nécessaires Préparation pour l’installationPour les installations initiales seulement Pièces FourniesPréparation DE L’ENCEINTE DU LAVE-VAISSELLE Planification PréalablePréparation DE LA Plomberie DE Vidange La terre conformément aux codes et règlements locaux Préparation Pour LE Branchement ÉlectriqueAlimentation électrique Mise à la terre-Branchement directPreparation DU Tuyau D’EAU Chaude Instructions d’installationÉtape 1 Repérage DES Articles Installer Étape 2 Installation DES Pièces DE FinitionÉtape 5 Retrait DE LA Plinthe Type 1 Câble à un trouType 2 Câble à trois trous Étape 10 Raccordement DU Tuyau Instructions dinstallationÉtape 8 Installation DU Coude Angle Droit ET DES Fils DE LA MaisonÉtape 11 Insertion DU Tuyau DE Vidange À Travers L’ARMOIRE Étape 13 Glissement DU LAVE- Vaisselle À SA Position FinaleLes commandes sur ces modèles sont conçues pour être Étape 14 Mise À Niveau DU LAVE-VAISSELLEConsidérations spéciales concernant la mise en place Mises de côté à l’étape Étape 16 Raccordement À L’ALIMENTATION D’EAUDans cette étape, vous Aurez besoin de 2 vis àÉtape 17 Raccordement DU Tuyau DE Vidange Installation DU Tuyau DE VidangeOuvrir la porte et enlever tout emballage en mousse Qui recouvre le panneau de commande et la portePour éviter des frais de service superflus, s’assurer Vérifier que le système est hors tension Arrêt Off’AMÉLIORATION DE L’INSONORISATION Certains Modèles Étape 20 Essai DU LAVE-VAISSELLE Avec DE L’EAUPub. Nº Pièce Nº 206C1559P184 Étape 23 Installation DE LA PlintheÉtape 24 Documentation Repérer la plinthe et les vis mises de côté à l’étape