GE r08654v-1 installation instructions Cutout for 27″ 68.6 cm Double Built-In Ovens only

Page 5

Installation Instructions

A

Cutout for 27(68.6 cm) Double Built-In

Ovens only

For JKP35, JKP55, JKP75, PK956, ZEK958 models only.

Allow 1(2.5 cm) for overlap of oven over side edges of cutout

2x 4

(5 cm x 10 cm) or equivalent runners

20(50.8 cm)

Allow a minimum of 20(50.8 cm) for clearance to adjacent corners, drawers, walls, etc. when door is open

 

 

5

 

 

(12.7 cm)

 

 

Max. from

 

 

the left or

Cabinet

right

Width

side

 

27

 

(68.6 cm)

Junction Box

 

Cutout

 

Location

 

Width

 

 

25(63.5 cm) Min.

25 1/4

(64.1 cm) Max.

44

(111.8 cm)

Min.

Cutout Above

Height base rail 49 11/16

(126.2 cm) Min.

50 1/8

(127.3 cm) Max.

 

Allo

w 1

Recommended

 

(2.5 cm) for

 

 

cutout location

 

 

overlap

of

oven

 

from floor 13 1/4

 

 

 

 

 

to

p

and

b

ottom

 

(33.7 cm)

 

 

 

 

 

of

cutout

 

 

 

Cabinet Width

27(68.6 cm)

Recommended

 

 

Cutout Location

 

 

from Floor

13

1/4(33.7 cm)

Cutout Depth

23

5/8(60 cm) Min.

Cutout Width

25(63.5 cm) Min.

 

25

1/4(64.1 cm) Max.

Cutout Height

49

11/16(126.2 cm) Min.

 

50

1/8(127.3 cm) Max.

NOTE: If the cabinet does not have a front frame and the sides are less than 3/4

(1.9 cm) thick, shim both sides equally to establish the cutout width.

If the cabinet does not have a solid bottom, two braces or runners must be installed to support the weight of the oven. For double ovens, the runners and braces must support 300 lbs (135 Kg).

NOTE: If marks, blemishes or the cutout opening are visible above the installed oven, it may be necessary to add wood shims under the runners and front trim until the marks or opening are covered.

Suitable

Bracing to Support Runners

C

L

18

(45.7 cm)

Over Centerline

of Cabinet

2x 4

(5 cm x 10 cm) or equivalent runners level with bottom of cutout

5

Image 5
Contents Installation Installation Instructions Do not Lift the Door By the Handle Pre-Installation ChecklistFor JKS10, JKP30, JKP70, PK916, ZEK938 models only Cutout for 27″ 68.6 cm Single Built-In Ovens onlyFor JKP35, JKP55, JKP75, PK956, ZEK958 models only Cutout for 27″ 68.6 cm Double Built-In Ovens onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Cutout for 30″ 76.2 cm Single Built-In Ovens only Side by Side InstallationsCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B4 Three-Conductor Branch Circuit Connection B3 New Construction Four-Conductor Branch Circuit ConnectionC2 Drilling the Pilot Holes and Mounting the Oven Securing the Oven in the OpeningC1 Sliding the Oven Into the Opening C4 Installing the Metal Bottom Trim C3 Preparing for the Bottom Trim InstallationReplacing the Oven Door Pre-Test Checklist Operation ChecklistPage ¿Preguntas? Visite nuestro sitio en la Web ge.com De instalaciónInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Instalaciones de lado a lado Corte para los hornos de una unidad de 30″ 76,2 cm solamenteDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Atención AL Instalador Conexiones eléctricasB4 Conexión de circuito ramal de tres conductores C2 Cómo taladrar los orificios piloto y montar el horno Posición firme del horno en la aberturaC1 Cómo deslizar el horno en el interior de la abertura C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control para la operación Lista de control antes de la pruebaNotas