GE r08654v-1 installation instructions Cabinetry

Page 12

Cabinetry

A

Cutout for 30(76.2 cm) Single or Double

Built-In Ovens only – Over a Warming Drawer

For JTP30, JTP35, JTP55, JTP70, JTP75, PT916, PT920, PT956, PT960, ZET938, ZET958 models only.

Single 30(76.2 cm)

Double 30(76.2 cm)

Oven Over a Warming

Oven Over a Warming

Drawer

Drawer

Per Warming

Drawer

Requirement

Anti-Tip Block Against

Rear Wall Per Warming

Drawer Requirement

2(5.1 cm)

Min.

NOTE: Install the oven only with specific models listed on the label located on top of the oven.

Per Warming

Drawer

Requirement

1(2.5 cm) Min. Above Toekick or

Adjust to Oven Installation Height

Anti-Tip Block

Against Rear

Wall Per

Warming

Drawer

Requirement

2(5.1 cm)

Min.

1(2.5 cm) Min. Above Toekick

NOTE: Additional clearances between cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height.

When installing a Warming Drawer below a single or double oven, a separate 120V, 60 Hz, properly grounded receptacle must be installed. Refer to installation instructions packed with the Warming Drawer for specific installation requirements.

12

Image 12
Contents Installation Installation Instructions Pre-Installation Checklist Do not Lift the Door By the HandleCutout for 27″ 68.6 cm Single Built-In Ovens only For JKS10, JKP30, JKP70, PK916, ZEK938 models onlyCutout for 27″ 68.6 cm Double Built-In Ovens only For JKP35, JKP55, JKP75, PK956, ZEK958 models onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Side by Side Installations Cutout for 30″ 76.2 cm Single Built-In Ovens onlyCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B3 New Construction Four-Conductor Branch Circuit Connection B4 Three-Conductor Branch Circuit ConnectionSecuring the Oven in the Opening C1 Sliding the Oven Into the OpeningC2 Drilling the Pilot Holes and Mounting the Oven C3 Preparing for the Bottom Trim Installation C4 Installing the Metal Bottom TrimReplacing the Oven Door Operation Checklist Pre-Test ChecklistPage De instalación ¿Preguntas? Visite nuestro sitio en la Web ge.comInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Corte para los hornos de una unidad de 30″ 76,2 cm solamente Instalaciones de lado a ladoDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Conexiones eléctricas Atención AL InstaladorB4 Conexión de circuito ramal de tres conductores Posición firme del horno en la abertura C1 Cómo deslizar el horno en el interior de la aberturaC2 Cómo taladrar los orificios piloto y montar el horno C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control antes de la prueba Lista de control para la operaciónNotas