GE r08654v-1 installation instructions Cabinetry

Page 7

Cabinetry

A

Cutout for 27(68.6 cm) Single or

Double Built-In Ovens only – Over a Warming Drawer

For JKS10, JKP30, JKP35, JKP55, JKP70, JKP75, PK916, PK956, ZEK938, ZEK958 models only.

Single 27(68.6 cm)

Double 27(68.6 cm)

Oven Over

Oven Over

a Warming Drawer

a Warming Drawer

 

Anti-Tip Block

Anti-Tip Block Against

Against Rear

Wall Per

Rear Wall Per Warming

Warming

Drawer Requirement

Drawer

2(5.1 cm)

Requirement

Min.

 

Per

Warming

Drawer

Requirement

NOTE: Install the oven only with specific models listed on the label located on top of the oven.

Per Warming

Drawer

Requirement

1(2.5 cm) Min. Above Toekick

1(2.5 cm) Min. Above Toekick or

Adjust to Oven Installation Height

2(5.1 cm)

Min.

NOTE: Additional clearances between cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height.

When installing a Warming Drawer below a single or double oven, a separate 120V, 60 Hz, properly grounded receptacle must be installed. Refer to installation instructions packed with the Warming Drawer for specific installation requirements.

7

Image 7
Contents Installation Installation Instructions Do not Lift the Door By the Handle Pre-Installation ChecklistFor JKS10, JKP30, JKP70, PK916, ZEK938 models only Cutout for 27″ 68.6 cm Single Built-In Ovens onlyFor JKP35, JKP55, JKP75, PK956, ZEK958 models only Cutout for 27″ 68.6 cm Double Built-In Ovens onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Cutout for 30″ 76.2 cm Single Built-In Ovens only Side by Side InstallationsCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B4 Three-Conductor Branch Circuit Connection B3 New Construction Four-Conductor Branch Circuit ConnectionC1 Sliding the Oven Into the Opening Securing the Oven in the OpeningC2 Drilling the Pilot Holes and Mounting the Oven C4 Installing the Metal Bottom Trim C3 Preparing for the Bottom Trim InstallationReplacing the Oven Door Pre-Test Checklist Operation ChecklistPage ¿Preguntas? Visite nuestro sitio en la Web ge.com De instalaciónInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Instalaciones de lado a lado Corte para los hornos de una unidad de 30″ 76,2 cm solamenteDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Atención AL Instalador Conexiones eléctricasB4 Conexión de circuito ramal de tres conductores C1 Cómo deslizar el horno en el interior de la abertura Posición firme del horno en la aberturaC2 Cómo taladrar los orificios piloto y montar el horno C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control para la operación Lista de control antes de la pruebaNotas