GE r08654v-1 B3 New Construction Four-Conductor Branch Circuit Connection

Page 15

Installation Instructions

B3 New Construction and

Four-Conductor Branch

Circuit Connection

When installing in new construction, or

When installing in a mobile home, or

When installing in a recreational vehicle, or

When local codes do not permit grounding through neutral:

a. Cut the neutral (white) lead from the crimp. Re-strip the neutral (white) lead to expose the proper length of conductor.

Ground

Wire

Junction Box

Cover

b. Attach the appliance grounding lead (green or bare copper) in accordance with local codes. If the residence grounding conductor is aluminum, see WARNING on page 14.

c. Connect the oven neutral (white) lead to the branch circuit neutral (white or gray) in accordance with local codes, using a wire nut.

d. Connect the oven red lead to the branch circuit red lead and the oven black lead to the branch circuit black lead in accordance with local codes, using wire nuts. If the residence red, black or white leads are aluminum conductors, see WARNING

on page 14.

e. Install Junction Box Cover.

B4 Three-Conductor Branch Circuit Connection

When connecting to a three-conductor branch circuit, if local codes permit:

a. Connect the bare oven ground conductor with the crimped neutral (white) lead to the branch circuit neutral (white or gray in color), using a wire nut.

Ground and

Neutral Wires

Junction Box

Cover

b. Connect the oven red lead to the branch circuit red lead in accordance with local codes, using a wire nut.

c. Connect the oven black lead to the branch circuit black lead in accordance with local codes, using a wire nut. If the residence red, black or white leads are aluminum conductors, see WARNING on page 14.

d. Install Junction Box Cover.

15

Image 15
Contents Installation Installation Instructions Do not Lift the Door By the Handle Pre-Installation ChecklistFor JKS10, JKP30, JKP70, PK916, ZEK938 models only Cutout for 27″ 68.6 cm Single Built-In Ovens onlyFor JKP35, JKP55, JKP75, PK956, ZEK958 models only Cutout for 27″ 68.6 cm Double Built-In Ovens onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Cutout for 30″ 76.2 cm Single Built-In Ovens only Side by Side InstallationsCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B4 Three-Conductor Branch Circuit Connection B3 New Construction Four-Conductor Branch Circuit ConnectionSecuring the Oven in the Opening C1 Sliding the Oven Into the OpeningC2 Drilling the Pilot Holes and Mounting the Oven C4 Installing the Metal Bottom Trim C3 Preparing for the Bottom Trim InstallationReplacing the Oven Door Pre-Test Checklist Operation ChecklistPage ¿Preguntas? Visite nuestro sitio en la Web ge.com De instalaciónInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Instalaciones de lado a lado Corte para los hornos de una unidad de 30″ 76,2 cm solamenteDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Atención AL Instalador Conexiones eléctricasB4 Conexión de circuito ramal de tres conductores Posición firme del horno en la abertura C1 Cómo deslizar el horno en el interior de la aberturaC2 Cómo taladrar los orificios piloto y montar el horno C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control para la operación Lista de control antes de la pruebaNotas