GE r08654v-1 Securing the Oven in the Opening, C1 Sliding the Oven Into the Opening

Page 16

Installation Instructions

C

Securing the Oven in the Opening

C1 Sliding the Oven Into the Opening

a. Loop (do not tie) a 36(91 cm) string around the conduit before the oven is slid into place. This will keep the conduit from falling behind the oven.

Pull out on string loop while pushing the oven into the cabinet

b. Lift oven into cabinet cutout using the oven opening as a grip. Carefully push against oven front frame. Do not push against outside edges.

c. As you slide the oven back, pull the string so that the conduit will lie on top of the oven in a natural loop.

d. When you are sure the conduit is out of the way, slide the oven 3/4 way back into the opening. Remove the string by pulling on one end of the loop.

C2 Drilling the Pilot Holes and Mounting the Oven

NOTE: Before drilling the pilot holes, make sure the oven is pushed as far back into the opening as it will go and centered.

a. Drill through the mounting holes (top and bottom) of the side trim, for the #8 screws provided.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The screws must

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mounting

 

 

 

 

 

Hole

 

 

be a minimum of

 

 

 

 

Locations

 

 

 

 

 

 

 

 

1/4(6 mm) from

 

 

 

 

(Hole

 

 

 

 

 

 

 

Locations

 

the front of the

 

 

 

 

may vary)

 

 

 

cutout.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARNING: Mounting

screws must be used. Failure to do so could result in the oven

falling out of the cabinet causing serious injury.

b. Secure the oven to cabinet with screws provided.

NOTE: If the cabinet is particle board, you must use #8 x 3/4particle board screws. These may be purchased at any hardware store.

16

Image 16
Contents Installation Installation Instructions Pre-Installation Checklist Do not Lift the Door By the HandleCutout for 27″ 68.6 cm Single Built-In Ovens only For JKS10, JKP30, JKP70, PK916, ZEK938 models onlyCutout for 27″ 68.6 cm Double Built-In Ovens only For JKP35, JKP55, JKP75, PK956, ZEK958 models onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Side by Side Installations Cutout for 30″ 76.2 cm Single Built-In Ovens onlyCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B3 New Construction Four-Conductor Branch Circuit Connection B4 Three-Conductor Branch Circuit ConnectionC1 Sliding the Oven Into the Opening Securing the Oven in the OpeningC2 Drilling the Pilot Holes and Mounting the Oven C3 Preparing for the Bottom Trim Installation C4 Installing the Metal Bottom TrimReplacing the Oven Door Operation Checklist Pre-Test ChecklistPage De instalación ¿Preguntas? Visite nuestro sitio en la Web ge.comInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Corte para los hornos de una unidad de 30″ 76,2 cm solamente Instalaciones de lado a ladoDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Conexiones eléctricas Atención AL InstaladorB4 Conexión de circuito ramal de tres conductores C1 Cómo deslizar el horno en el interior de la abertura Posición firme del horno en la aberturaC2 Cómo taladrar los orificios piloto y montar el horno C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control antes de la prueba Lista de control para la operaciónNotas