C3 Preparing for the Bottom Trim Installation

a. With oven installed, take the bottom trim and center it on the bottom front edge of the cabinet opening.

b. Using the trim

For 27(68.6 cm)

models with Lower

as a template,

Trim in Position,

mark the center

Mark (2) Mounting

Hole Locations

of each slot

here

(two total) where

 

the mounting holes

 

will be drilled.

 

c. Remove the trim.

 

*

* Remove

For 30(76.2 cm)

models with

 

Lower Trim

d. Drill pilot holes into

Lower Trim in

Before

Position, Mark

the center of each

Pre-drilling

(2) Mounting

template mark.

Mounting

Hole Locations

Holes

here

 

 

C4 Installing the Metal

Bottom Trim

a. Place the bottom metal trim centered over the pre-drilled mounting holes. Tape the edges of the trim down to maintain the alignment.

b. Using two trim screws provided, secure the bottom trim to the bottom edge of the cabinet.

Side

Trim

Trim Screw Locations for 27(68.6 cm) models with

Lower Trim Side

Trim

Metal Lower Trim

Trim Screw Locations for 30(76.2 cm) models with

Lower Trim

IMPORTANT: If this unit is ever removed from the cabinet or the oven is ever pulled out for service, the trim must be removed first or damage to the trim will occur.

17

Image 17
Contents Installation Installation Instructions Do not Lift the Door By the Handle Pre-Installation ChecklistFor JKS10, JKP30, JKP70, PK916, ZEK938 models only Cutout for 27″ 68.6 cm Single Built-In Ovens onlyFor JKP35, JKP55, JKP75, PK956, ZEK958 models only Cutout for 27″ 68.6 cm Double Built-In Ovens onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Cutout for 30″ 76.2 cm Single Built-In Ovens only Side by Side InstallationsCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B4 Three-Conductor Branch Circuit Connection B3 New Construction Four-Conductor Branch Circuit ConnectionC2 Drilling the Pilot Holes and Mounting the Oven Securing the Oven in the OpeningC1 Sliding the Oven Into the Opening C4 Installing the Metal Bottom Trim C3 Preparing for the Bottom Trim InstallationReplacing the Oven Door Pre-Test Checklist Operation ChecklistPage ¿Preguntas? Visite nuestro sitio en la Web ge.com De instalaciónInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Instalaciones de lado a lado Corte para los hornos de una unidad de 30″ 76,2 cm solamenteDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Atención AL Instalador Conexiones eléctricasB4 Conexión de circuito ramal de tres conductores C2 Cómo taladrar los orificios piloto y montar el horno Posición firme del horno en la aberturaC1 Cómo deslizar el horno en el interior de la abertura C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control para la operación Lista de control antes de la pruebaNotas