GE r08654v-1 installation instructions Must Support 150 LBS Kg

Page 6

Installation Instructions

A

Cutout for 27(68.6 cm) Single Built-In

Ovens only Under Counter

For JKS10, JKP30, JKP70, PK916, ZEK938 models only.

Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for cutout size. See label on top of oven for approved cooktop models.

25(63.5 cm)

Top and/or side fillers may be necessary

if unit is positioned between existing cabinets. Be sure they are attached securely, since they will anchor the oven in the cabinet.

3/4(1.9 cm)

Support Platform

Required

25(63.5 cm) Min.

25 1/4(64.1cm) Max.

275/8(70.2 cm) Min.

281/8(71.4 cm) Max.

240V / 208V

 

 

Junction Box

 

5

Location

(12.7 cm)

Max. from the

 

left or right

 

 

side

 

 

 

Allow

1

(2.5 cm)

unit overlap top and bottom of oven, 1(2.5 cm) unit overlap side edges

Must match toekick height

Gas and electrical connections for gas cooktop must be located in an adjacent accessible location to the right.

22(55.9 cm) Min.

Above Support 36(91.4 cm)

PlatformTypical Countertop Height

24(61cm)

4(10.2 cm)

Typical

Toekick

MUST SUPPORT 150 LBS. (68 Kg)

NOTE: This oven is only approved to be installed under the specific models as labeled on this unit.

6

Image 6
Contents Installation Installation Instructions Pre-Installation Checklist Do not Lift the Door By the HandleCutout for 27″ 68.6 cm Single Built-In Ovens only For JKS10, JKP30, JKP70, PK916, ZEK938 models onlyCutout for 27″ 68.6 cm Double Built-In Ovens only For JKP35, JKP55, JKP75, PK956, ZEK958 models onlyMust Support 150 LBS Kg Cabinetry Cutout for 27″ 68.6 cm Single Ovens only Side by Side Installations Cutout for 30″ 76.2 cm Single Built-In Ovens onlyCutout for 30″ 76.2 cm Double Built-In Ovens only Approved to be installed under Cabinetry Cutout for 30″76.2 cm Single Ovens only Electrical Connections B3 New Construction Four-Conductor Branch Circuit Connection B4 Three-Conductor Branch Circuit ConnectionSecuring the Oven in the Opening C1 Sliding the Oven Into the OpeningC2 Drilling the Pilot Holes and Mounting the Oven C3 Preparing for the Bottom Trim Installation C4 Installing the Metal Bottom TrimReplacing the Oven Door Operation Checklist Pre-Test ChecklistPage De instalación ¿Preguntas? Visite nuestro sitio en la Web ge.comInstrucciones de instalación Lista de control antes de la instalación Corte para los hornos de una unidad de 27″ 68,6 cm solamente 49 11/16 126,2 cm Mín 50 1/8 127,3 cm Máx Debe Soportar 150 Libras Gabinetes Horno individual de 27″ 68,6 cm Corte para los hornos de una unidad de 30″ 76,2 cm solamente Instalaciones de lado a ladoDesde el piso 12 30,5 cm Debe Soportar 150 Libras 68 Kg Gabinetes Horno individual de 30″ 76,2 cm Conexiones eléctricas Atención AL InstaladorB4 Conexión de circuito ramal de tres conductores Posición firme del horno en la abertura C1 Cómo deslizar el horno en el interior de la aberturaC2 Cómo taladrar los orificios piloto y montar el horno C3 Preparación para la instalación de la moldura de fondo Cómo instalar la puerta del horno Lista de control antes de la prueba Lista de control para la operaciónNotas