Delivery | 1 | Electrical Connection | 22 |
Unpacking | 1 | Motor Rotation | 24 |
Safety Procedures and Precautions | 2 | Mobile Equipment Restraint | 25 |
|
| Water Quality Requirement | 26 |
Installation |
| Water Connections | 27 |
Site Requirements | 3 | Water Drainage | 28 |
Ventilation Requirements | 3 | Installation Checklist | 29 |
Positioning on Site | 4 | Control Reset | 30 |
Lifting Instructions | 5 | Error Codes | 30 |
Leveling | 6 |
|
|
Stand Installation | 6 | Ventless Hood Option |
|
Accessories | 7 | Condensate Drain | 34 |
Specifications, 6•10es | 8 | Filter Door Latch | 34 |
Specifications, 6•10esi | 9 | Operation | 35 |
Specifications, 6•10esiN | 10 |
|
|
Specifications, 10•10es | 11 | Warranty |
|
Specifications, 10•10esi | 12 | Original Equipment Limited Warranty | 36 |
Specifications, 10•10esiN | 13 | Transportation Damage and Claims | 37 |
Specifications, 7•14es | 14 |
|
|
Specifications, 7•14esi | 15 |
|
|
Specifications, 10•18es | 16 |
|
|
Specifications, 10•18esi | 17 |
|
|
Specifications, 12•20es | 18 |
|
|
Specifications, 12•20esi | 19 |
|
|
Specifications, 20•20es | 20 |
|
|
Specifications, 20•20esi | 21 |
|
|
i