Contents
Main
36 CF ST/Pier Gas Fireplace
Installation Manual
2 Introduction
Overview
Listing Details
ICBO Approval
Massachusetts Approval
Table of Contents 3
Introduction
Safety Precautions
Features and Specifications
Installation
4 Safety Precautions
Safety Warnings:
Safety Precautions 5
Safety Warnings (continued):
6 Features and Specifications
Installation Options
Specifications
Dimensions
Packing List
Additional Items Required
Recommended Installation Procedure
Massachusetts Requirements
Requirements for the Commonwealth of Massachusetts
MANUFACTURER REQUIREMENTS
Preparing the Fireplace Stand-offs
Fireplace Placement Requirements
Clearances
Raised Fireplaces
Minimum Framing 36 CF ST (See Through)
Front Back
Figure 5
Right Left
Travis Industries 4090102 100-01212_000
Framing Dimensions 36 CF Pier
Figure 6
Front Back
Right Left
Page
Required Electrical Connection
Battery Pack / Learn Switch Installation
Figure 8
Steps for Installing the Battery Box and Learn Switch
INSTALLATION WARNING Remote Synchronization
Battery Installation
Remote Synchronization
Gas Line Requirements
Gas Line Connection
Gas Inlet Pressure
Vent Requirements
Approved Vent
Altitude Considerations
Vent Installation
Vent Clearances
Vent Location
Approved Vent Configurations
Exhaust Restrictor Adjustment
Page
Approved Vent Configuration Rear Vent, Horz. Term. (1 45
, 2 90
Elbows)
Approved Vent Configuration Rear Vent, Horz. Term. (1 45
, 4 90
Elbows)
Approved Vent Configuration Rear Vent, Vert. Term. (1 45
, 3 90
Elbows)
Approved Vent Configuration Top Vent, Horz. Term. (1 45
,1 90
Elbows)
Approved Vent Configuration Top Vent, Horz. Term. (1 45
, 3 90
Elbows)
Approved Vent Configuration Top Vent, Vert. Term. (1, 3, or 5 45
Elbows)
Approved Vent Configuration Top Vent, Vert. Term. (1 45
,2 90
Figure 19
Elbows)
Termination Requirements
! Venting terminals shall not be recessed into a wall or siding.
Hearth Requirements
NOTE: Whenever using a hearth over 1 thick, the fireplace will need to be raised.
Figure 20
Side View
Flush Hearth
Side View
Figure 21
Facing Requirements
Figure 22
Non-Combustible Facing
Mantel Requirements
Figure 24
SEE THROUGH
PIER
Steps for Finalizing the Installation
Air Shutter Adjustment
Correct
Not Enough Air
Too Much Air
Glass Frame Removal and Installation
Log Set Installation
Ember Placement
Rock Wool Placement
Page
Page
Page
LP Conversion Instructions
Page
Page
LP (Propane)
NG (Natural Gas)
Rate Screws
Power Heat Duct Installation
Andiron Installation
48 Index
Index