48Index
Index
Andiron Installation | 47 | Installation Options | 6 |
Additional Items Required | 7 | Listing Details | 2 |
Air Shutter Adjustment | 37 | LP Conversion Instructions | 43 |
Altitude Considerations | 19 | Mantel Requirements | 35 |
Approved Vent | 19 | Minimum Framing | 11 |
Battery Installation | 16 | Overview | 2 |
Battery Pack / Learn Switch Installation | 15 | Packing List | 7 |
Clearances | 10 | Power Heat Duct Installation | 47 |
Dimensions | 6 | Preparing the Fireplace | 9 |
34 | Raised Fireplaces | 10 | |
Facing Requirements | 33 | Recommended Installation Procedure | 7 |
Fireplace Placement Requirements | 10 | Remote Synchronization | 17 |
Framing Dimensions | 12 | Safety Precautions | 4 |
Gas Inlet Pressure | 18 | Specifications | 6 |
Gas Line Connection | 18 | Termination Requirements | 30 |
Gas Line Requirements | 18 | Vent Clearances | 20 |
Glass Frame Removal and Installation | 38 | Vent Installation | 19 |
Hearth Requirements – Recessed Hearth | 32 | Vent Requirements | 19 |
Hearth Requirements | 31 |
|
|
© Travis Industries | 4090102 |