Preparing the Site for the VCN Access Concentrator 11
CAUTION: Installation should be performed only by a qualified technician
The VCN AP
If there is no patch panel, the VCN AC unit connects directly to the VCN
AC punch-down block and VCN AP punch-down blocks.
The VCN AC unit should be installed at the PBX
The unit is installed in a
There are two methods for installing the Visitor and Community Network system:
■With a patch panel.
■Without a patch panel.
Installing the VCN To install the VCN AP
1Select the wire pairs according to their position in the
Where there is only one telephone line in a room, the two wires are connected to the inner wire pair of the phone connector shown in Figure 4 and Figure 5. The outer wire pair of the phone connector is not used.
■ The inner wire pair carries both voice and digital date.