16Visitor and Community Network Access Concentrator Installation Guide

Installing the VCN

Access

Concentrator

Mounting the VCN

Access Concentrator

in the 19-inch Rack

Before installing the VCN AC make sure that:

The unit is accessible and can be connected easily.

Cabling is away from:

Sources of electrical noise such as radios, transmitters and broadband amplifiers

Power lines and fluorescent lighting fixtures

Water or moisture cannot enter the case of the unit.

Air-flow is not restricted around the unit or through the vents in the side of the switch. Make sure you provide a minimum of 2.5 cm (1 inch) clearance between the Ethernet switch and the VCN AC

It is recommended to have a ventilated or air conditioned room.

The VCN AC is within cable reach of both the patch panel and the Ethernet switch for which the unit is to be attached.

Table 2 lists the accessories needed for mounting the VCN AC in the 19-inch rack.

Table 2 The VCN Access Concentrator Accessory Set

No.

Part

Quantity

 

 

 

1

VCN AC unit

1

 

 

 

2

19-inch brackets

2

 

 

 

3

Handles

2

 

 

 

4

Screws for handles

4

 

 

 

5

Screws for brackets

8

 

 

 

In addition to the VCN AC unit, you will find a box containing the cable kit needed to install the VCN AC.

Table 3 lists the cable kit parts.

Table 3 The Cable Kit

No.

Part

Quantity

 

 

 

1

Power Cord

1

 

 

 

2

UTP CAT-5 Patch Cords

24

 

 

 

3

Flat cables (1.5 m each) with

2

 

RJ-21 connectors

 

 

 

 

Page 16
Image 16
3Com DIA3CV1100-02 manual Installing the VCN Access Concentrator, Mounting the VCN Access Concentrator 19-inch Rack