Installing the VCN Access Concentrator 19

Front Panel Connections

Refer to “Preparing the Site for the VCN Access Concentrator” on page 10 before connecting the VCN AC to the Ethernet switch Switch through the front.

Figure 11 displays the rack after it has been wire connected.

Figure 11 Patch Panel and the Ethernet Switch Connected to the VCN Access

Concentrator

Patch Panel

N A UT O

Flat C able

SuperStack II

Sw itch 1100/3300

VCN AC

24R J-45 conn betw een VC N and the Super Sw itch 1100/3

Figure 12 shows all the connections in the network.

Page 19
Image 19
3Com DIA3CV1100-02 manual Front Panel Connections, Vcn Ac