ADCP-96-015 • Issue 1 • July 2004

FRONT SIDE

FMS SLEEVE

COVER

FMS-20000

ACE-142V

CABINET

REAR SIDE

HEX BOLTS, FLAT

WASHERS, AND

NUTS (4 PLACES)

GROUND SPACER

(ACCESSORY)

CAPSCREWS, LOCK

WASHERS, AND FLAT

WASHERS (4 PLACES)

FMS ADAPTER

COVER

19814-A

Figure 6. Mounting The ACE-142V Cabinet on the FMS-20000

7.Using appropriate lifting equipment, hold the cabinet in position over the FMS-20000 so the cabinet is suspended over the rectangular opening in the top of the ground spacer or adapter cover.

8.Carefully route the distribution cables through the rectangular opening in the ground spacer or adapter cover and into the FMS-20000.

Note: The cables are coiled on spools for shipment. On each spool is a label that lists each fiber subunit within the cable and the connector panels where each subunit is terminated. After the cable is unspooled, label each cable with the corresponding fiber subunit and connector panel designations. In addition, tag or label the stub end of each cable so that the cable can be identified after being routed to the splice enclosure.

9. Locate the ends of the conduit sections that were installed in the bottom of the FMS-20000.

Page 13

© 2004, ADC Telecommunications, Inc.