ADCP-96-015 • Issue 1 • July 2004

4 IN DUCT FOR

DISTRIBUTION CABLES (LOCATE 1 - 2 INCHES BELOW TOP OF PAD)

4 IN DUCT FOR

FEEDER CABLES

(LOCATE 1 - 2 INCHES BELOW TOP OF PAD)

PAD MOUNT FRAME

CAST IN PLACE

REINFORCED

CONCRETE PAD

6IN.

(15.2 CM)

SAND OR

GRAVEL

4 IN. MIN.

(10.2 CM)

44.0IN.

(111.8 CM)

30.6IN.

(77.7 CM)

26.1IN.

(66.4 CM)

9.0 IN.

(22.9 CM)

28.0 IN.

(71.1 CM)

33.0 IN.

(83.8 CM)

72.0 IN.

(182.9 CM)

FRONT

DO NOT POUR CONCRETE INSIDE

THE PAD MOUNT FRAME

GROUNDING ROD

(LOCATE 1 - 2 INCHES BELOW TOP OF PAD)

90 BEND

TOP OF PMF SHOULD

 

BE FLUSH WITH TOP

 

IN DUCT

TOPSOIL OR

OF CONCRETE

 

DECORATIVE ROCK

 

 

 

 

GRADE

COMPACTED SOIL

19616-A

Figure 8. Constructing the Concrete Pad for the ACE-142S/142V Cabinet