5.Starting at the cut end, measure backward and mark the
6.Starting at the breakout mark, remove the protective jackets to expose the distribution cable fibers (may be stranded or ribbon fibers) and the connector panel pigtail fibers.
7.Install the connector panel pigtail subunit and the distribution cable fiber subunit in the splice tray and complete all splices per local practice. Refer to Section 7 for details and then return to Step 8 to continue this procedure.
8.After splicing is completed, the splice tray cover replaced, and the excess slack rolled up, insert the splice tray into the designated mounting slot.
9.Repeat this procedure for each connector panel pigtail subunit.
10.When all splices have been completed,
11.Connector panel designation labels, shown in Figure 26 and Figure 27, are provided on the front door of the cabinet for recording subscriber information. For each connector panel, indicate the subscriber address and service information and the fiber and cable number if not specified. Splice tray designation labels, shown in Figure 28, are provided on the rear door of the cabinet for recording distribution cable information. For each splice tray, indicate the distribution cable and subunit number.
FRONT DOOR | REAR DOOR |
|
|
| 1 | 2 | 3 | 4 |
|
|
|
|
| ||
| SPL TRAY 1 | SPL TRAY 1 | SPL TRAY 1 | SPL TRAY 1 | ||
| FBR 1 | FBR 2 | FBR 3 | FBR 4 | ||
|
|
| 19 | 20 | 21 | 22 |
|
|
|
|
| ||
PANEL | SPL TRAY 2 | SPL TRAY 2 | SPL TRAY 2 | SPL TRAY 2 | ||
|
| FBR 7 | FBR 8 | FBR 9 | FBR 10 | |
|
| 1 | 37 | 38 | 39 | 40 |
|
|
|
|
| ||
|
|
| SPL TRAY 4 | SPL TRAY 4 | SPL TRAY 4 | SPL TRAY 4 |
|
|
| FBR 1 | FBR 2 | FBR 3 | FBR 4 |
|
|
| 55 | 56 | 57 | 58 |
SPL TRAY 5 | SPL TRAY 5 | SPL TRAY 5 | SPL TRAY 5 |
FBR 7 | FBR 8 | FBR 9 | FBR 10 |
LABEL FOR LEFT SIDE
OF CONNECTOR PANEL #1
Figure 26. Connector Panel Designation Label - Type 1
Page 35
© 2004, ADC Telecommunications, Inc.