Manuals
/
Brands
/
Laundry Appliance
/
Clothes Dryer
/
Alliance Laundry Systems
/
Laundry Appliance
/
Clothes Dryer
Alliance Laundry Systems
70269701R4 manual
22
1
22
66
66
Download
66 pages, 1.31 Mb
Notes
20
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
70269701
Contents
Page
Page
In the U.S.A
In Canada
In Australia
•WHAT TO DO IF YOU SMELL GAS:
–Do not try to light any appliance
Notes
Contents
Steam Requirements
Adjustments
Removing Tumbler from Service
Introduction
Introduction
35 Pound
Customer Service
Serial Plate Location
Wiring Diagram
Page
Safety Information
Save These Instructions
Important Safety Instructions
Grounding Instructions
DO NOT DRY
DO NOT
Installation Instructions
Page
Specifications and Dimensions
Specifications and Dimensions
Cabinet Dimensions – 25, 30 and
Pound Models
Models
Cabinet Dimensions – T30
Exhaust Outlet Locations
Rear Exhaust
Diameter
25/30 Pound
Gas Connection Locations
Gas Connection – CE and Australian Units
Gas Connection – Non-CEand Non-AustralianUnits
Electrical Connection Locations
Electrical Service
Gas and Steam Models
Steam Connection Locations
Inlet
Outlet
25/30/35 Pound
T30 (Upper)
Page
Installation
Installation
Tumbler Enclosure
NOTE: Shaded areas indicate adjacent structure
Position and Level the Tumbler
NOTE: Do not throw bolts away – they are the leveling legs
Stacked Tumblers Only:
Removal of Existing Timing Cam
Installation of New Timing Cam
Required for CE Models Only
General Information
Country
Supply
Injector
Capacity
Gas Type
Diameter
GB/IE/PT
ES/IT/GR
LU/CH
AT
Basic Configuration
Specific Conversion Procedures
Page
NOTE: Blank injectors (orifices) are available as Part No. M400995
Page
Exhaust Requirements
Individual Venting
Page
Manifold Venting
Page
25 and 30 Pound
T30 and 35 Pound
Station
6 in. (152 mm) Duct
8 in. (203 mm) Duct
Gas Requirements
Use pipe compound, resistant to actions of L.P. Gas, on all pipe threads
Gas Supply Pipe Sizing and Looping
Equivalent Length
25 feet
50 feet
75 feet
100 feet
High Altitude Orifice Sizing
Altitude
Orifice
New Rate
feet
Page
Electrical Requirements
For CE Models Only
Electrical Requirements
Service/Ground Location
Heat Source
Ground Lug and Terminal Block Locations
25, 30 and
Configuring Your Tumbler for Other Service Voltages
Stacked Tumbler Electrical Connections
Conversion Instructions
120 Volt/60 Hertz
208-240Volt/60 Hertz/1 Phase Models:
3W&G
2W&G
200-220Volt/60 Hertz
100 Volt/60 Hertz/1 Phase INTERNATIONAL Models:
100 Volt/50 Hertz/1 Phase INTERNATIONAL Models:
200 Volt/50 Hertz
380 Volt/50 Hertz
Ferrite Ring Installation
Gas and Steam OPL Micro Control Models Only
Electrical Requirements for Gas and Steam Models
For 25, 30 and 35 Pound Gas and Steam Models:
NOTE: Use copper conductors only
NOTE: Connect to individual branch circuit
For T30 Gas and Steam Models
(For Total Machine):
120V/60 Hz/1ph
Electrical Requirements for Electric Models
For 9 kW 25 Pound Electric Models:
For 12 kW 25 Pound Electric Models:
For 21 kW Models:
30 Pound Electric
T30 Electric not available in single phase
200V/60Hz/1ph
230-240V/50Hz/1ph
For 24 kW Models:
35 Pound Electric
Fuse or Breaker
Rating (Amps)
Steam Requirements
Installing Steam Trap and Making Condensate Return Connections
Steam Pressure
(Pounds Condensate/Hour)
Page
Adjustments
Airflow Switch
Door Strike
Removing Tumbler from Service