Allied Telesis X600-48TS/XP, x600-48Ts Installing the Switches in an Equipment Rack, Actactivity

Models: x600-48Ts X600-48TS/XP X600-24TS-POE+ X600-24TS x600-24Ts/XP x600-24Ts-POE

1 112
Download 112 pages 51.04 Kb
Page 71
Image 71

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

Installing the Switches in an Equipment Rack

Perform the following procedure to install each switch in a standard

19-inch rack:

Note

Steps 1, 2, and 3 are optional. These steps provide instructions on how to remove the snap-on plastic feet from the bottom of a switch. You can leave the feet on.

1.Place the switch upside down on a level, secure surface.

2.Using a flat-head screwdriver, remove the snap-on plastic feet from the bottom of the switch, as shown in Figure 31.

Figure 31. Removing the Feet

3.Turn the switch over.

4.Attach a rack-mount bracket to one side of the switch using four of the screws that come with the switch, as shown in Figure 32.

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

21R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

23R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22R

1000

LINK /

PORT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24R

FDX

ACTACTIVITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

21

 

10/100

LINK /

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HDX /

ACT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22

 

 

COL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23

 

 

 

STACK

 

 

 

 

 

 

 

 

x600-

 

 

 

 

 

 

 

 

24

 

 

 

 

 

 

SD

 

 

 

 

24Ts/XP

 

 

 

 

 

 

25

 

 

1

3

5

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

11

 

 

 

 

 

Layer 3

Gigabit

 

 

 

 

 

 

 

26

 

 

 

 

 

 

13

15

17

19

 

 

SFP

 

Ethenet Switch

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

21R

23R

CONSOLE

 

 

 

 

 

 

 

 

4

6

8

 

 

 

 

 

 

 

 

 

 

 

STATUS

 

 

 

 

 

 

 

 

 

 

 

10

12

14

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

20

 

 

 

 

 

FAULT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

22R 24R

 

 

MASTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RPS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PWR

RESET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1327

Figure 32. Attaching Rack-Mount Brackets

71

Page 71
Image 71
Allied Telesis X600-48TS/XP, x600-48Ts, x600-24Ts/XP, X600-24TS Installing the Switches in an Equipment Rack, Actactivity