Allied Telesis x600-24Ts/XP, x600-48Ts, x600-24Ts-POE, X600-24TS-POE+ Installing an XFP Transceiver

Models: x600-48Ts X600-48TS/XP X600-24TS-POE+ X600-24TS x600-24Ts/XP x600-24Ts-POE

1 112
Download 112 pages 51.04 Kb
Page 85
Image 85

Installing an XFP Transceiver

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

To install an XFP transceiver in an x600 switch, perform the following procedure:

1.Remove the dust plug from a transceiver slot on the switch. Refer to Figure 44.

L/A

1000

LINK /

PORT

ACTIVITY

 

 

 

 

 

 

 

 

 

 

D/C

 

 

 

 

 

 

 

 

 

 

FDX

 

 

 

 

 

 

 

 

 

 

 

 

 

ACT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10/100

LINK /

 

 

 

 

 

 

 

 

 

 

 

 

 

HDX

ACT

 

 

 

 

 

 

 

 

 

XFP

 

/

COL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L/A

XFP

 

STACK

 

 

 

 

 

 

 

24

 

 

 

 

 

 

1

 

 

 

SD

 

 

 

 

 

 

MSTR

 

3

 

 

 

 

 

 

 

 

 

L/A

5

 

 

 

 

 

 

 

 

 

1

 

 

7

 

 

 

25

 

 

 

L/A

 

 

 

9

 

 

 

 

 

 

D/C

 

 

 

1

 

 

 

 

2

 

 

 

 

 

 

 

 

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26

 

PRES

D/C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

4

6

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1336

 

 

 

 

 

 

Figure 44. Removing an XFP Dust Plug

2.Remove the transceiver from its shipping container and store the packaging material in a safe location.

3.Position the transceiver with the label facing down.

4.Slide the transceiver into the slot until it clicks into place.

L/A

1000

LINK /

PORT

ACTIVITY

 

 

 

 

 

 

 

 

 

 

D/C

 

 

 

 

 

 

 

 

 

 

FDX

 

 

 

 

 

 

 

 

 

 

 

 

 

ACT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10/100

LINK /

 

 

 

 

 

 

 

 

 

 

 

 

 

HDX

ACT

 

 

 

 

 

 

 

 

 

XFP

 

/

COL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L/A

 

 

STACK

 

 

 

 

 

 

 

24

 

 

 

 

XFP

 

 

1

 

 

 

SD

 

 

 

 

 

 

MSTR

 

3

 

 

 

 

 

 

 

 

 

L/A

5

 

 

 

 

 

 

 

 

 

1

 

 

7

 

 

 

25

 

 

 

L/A

 

 

 

9

 

 

 

 

 

2

D/C

 

 

 

 

1

 

 

 

 

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

26

 

PRES

D/C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

4

6

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1316

 

 

 

 

 

 

Figure 45. Installing an XFP Transceiver

85

Page 85
Image 85
Allied Telesis x600-24Ts/XP, x600-48Ts, x600-24Ts-POE, X600-24TS-POE+, X600-48TS/XP manual Installing an XFP Transceiver