18 Smart-UP VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B
Mechanical assembly
Stabilizing Brackets
Always install the Stabilizing Brackets on the 13.85 in/352 mm Enclosure (shipped with the UPS) to
enhance the stability of the Enclosure.
If the Enclosure needs to be moved after Stabilizing Brackets have been attached to the Enclosure,
the Stabilizing Brackets must be pushed up into their high position.
Loosen the two screws of both Stabilizing Brackets, and push the bracket up into the high
position.
When the Enclosure has reached its new position, push the Bracket into its “down” position
again, and tighten the screws.
Note
Attach the Stabilizing Bracket to the UPS Enclosure re-using the screws used to secure
the UPS to the pallet during shipment.
WARNING!
For stability reasons, do not remove Stabilizing Brackets from 13.85 in/352 mm
Enclosures.
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
10/100Base-T
Probe
AP9619 Network Management Card EM
!
Reset
Output Pwr Zone
10/100
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Stabilizing
Bracket