Manuals
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
208/220
installation manual
Smart-UPSVT
Models:
208/220
1
1
48
48
Download
48 pages
21.77 Kb
1
2
3
4
5
6
7
8
Install
Symbols used in this guide
EPO switch wiring
Mechanical assembly
Setting the leveling feet
Checklist
Safety
Page 1
Image 1
Smart-UPS
®
VT
10-30
kVA
208/220 V
Site Preparation and Installation Manual
Page 1
Page 2
Page 1
Image 1
Page 1
Page 2
Contents
Smart-UPSVT
Page
Smart-UPSVT 10-30 kVA 208/220
Page
Contents
Mechanical assembly
Symbols used in this guide
General Safety Instructions
Environmental symbols
General safety
Introduction
13.85 in/352 mm Enclosures
UPS Family Range and Components
20.59 in/523 mm Enclosures
Type label
Serial number
User interface
Upper Cover Plate rear Upper part of Conduit Box
Connection Interface rear
Foot print
Humidity Sensor
Clearance for 20.59 in/523 mm Enclosures
Installation Space Requirements
Clearance for stand-alone 13.85 in/352 mm Enclosures
Operating conditions
Operating Environment
Heat dissipation
Audible noise
Recommended current protection
Minimum breaker settings for 10 kVA UPS
Minimum breaker settings for 20 kVA UPS
Minimum breaker settings for 15 kVA UPS
Minimum setting of breakers for 30 kVA UPS
Diameter
EPO switch wiring
EPO
Basic Wiring Overview
System components. Have you
Site Preparation Checklist
Stabilizing Brackets
Leveling Feet
Setting the leveling feet
Drilling floor holes for floor anchoring
Floor Anchoring
Hole positions for floor anchors stand-alone Enclosures
Floor anchoring of stand-alone systems
System-Electrical Information
Electrical Installation
UPS ratings 220
Source connections
Utility source Provided by others
Utility source
Wiring
Wiring procedure single mains
Input/Output Wiring Single Mains default
Mains input Neutralcables Output cables
Wiring procedure dual mains
Input/Output Wiring Dual Mains
Electrical Installation Input/Output Wiring Dual Mains
Wiring to battery bank or battery racks Bat+
External Battery Wiring
Communication Wiring to EPO and Optional Equipment
Pin connections J106 UPS to J200 XR Enclosure option
Pin connections J106 XR Enclosure and J108 EPO
J106 Charging control switch Switch J200 XR Batteries
+24V Normally Closed
Pin connections J108 for EPO wiring options
Front panel removal
Connection of APC Humidity Sensor
Electrical Installation Connection of APC Humidity Sensor
Wiring Verification Procedure
Installation Site Checklist
990-1598B
Top
Page
Image
Contents