Electrical Installation – Wiring

Wiring

Make sure the UPS is in its location of use before wiring begins.

Note

CAUTION!

Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is present.

Power terminal lug diameter: minimum 0.2 in/6 mm.

Torque value: 45 lbf-in/7Nm.

Note

If floor anchoring is required, attach the Floor Anchoring Brackets to the UPS now. Follow step 1 under Floor Anchoring (Option).

Note

Please leave a copy of your wiring diagram with the customer to facilitate maintenance and troubleshooting.

Note

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

27

Page 33
Image 33
American Power Conversion 208/220 installation manual Wiring