Mechanical assembly – Floor Anchoring

Recommended minimum number of floor bolts per Enclosure: 4 (1 in each corner).

Recommended floor bolt size: 5/16(3/8) in/8 mm.

Note

Floor anchoring of stand-alone systems

In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be secured in the Enclosure by the Battery Securing Brackets.

For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet during transport.

BATTERY UNIT

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

BATTERY UNIT

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

BATTERY UNIT

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

BATTERY UNIT

 

 

 

Floor Anchoring Bracket

(re-use of transport bracket)

 

Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the Enlosures to the pre-drilled holes in the floor